Maintenance and Accelerator Support. RHIC run10. Wednesday May 5 th :. Short maintenance this time around RHIC: Tunnel areas opened at *0800. Delays to some areas doe to increased HP survey activity. NOT ALL AREAS OPENED Berm access and power outages limited

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Maintenance and Accelerator Support' - aram


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Wednesday may 5 th
Wednesday May 5th:

  • Short maintenance this time around

  • RHIC:

    • Tunnel areas opened at *0800. Delays to some areas doe to increased HP survey activity.

    • NOT ALL AREAS OPENED

    • Berm access and power outages limited

  • AGS controlled access for specific jobs only.

  • LINAC and Booster remain running for NSRL


Major jobs
Major jobs:

  • RHIC:

    • Maintenance items only at this time.

    • LL timing effort continues

  • AGS:

    • Polarimeter C15 continued work

    • Controlled access only


Scheduling meeting
Scheduling Meeting

  • Next week, here after time meeting.

  • Attendance by ALL groups performing work essential for continued success.

  • Those needing access must attend to avoid missing access windows.


Schedule
Schedule

0800hrs AGS CA LOTO Application

Experiments to XA

HP Surveys at beam dumps, collimators etc.

0830hrs RHIC RA in select areas ONLY

0930hrs Access AGS through South gate.

Survey for RA

1400hrs Begin RHIC RF checkout (RF to RFNA mode)

Begin RHIC MMPS restoration

1500hrs Secure AGS, remove LOTO

Sweep Experimenter IRs

1600hrs Begin physics restoration