1 / 19

Report of TC -2009 Ruud Morssinkhof

09/201. Report of TC -2009 Ruud Morssinkhof. 17/10/2009. General impression Projects Ongoing from 2008 New in 2009 Proposal 2010 Standardisation TC 88 : Insulation TC 89-WG12 : reflective insulation TC 127 : Fire safety in buildings. Subjects. General. Three meetings

Download Presentation

Report of TC -2009 Ruud Morssinkhof

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 09/201 Report of TC -2009Ruud Morssinkhof 17/10/2009

  2. General impression Projects Ongoing from 2008 New in 2009 Proposal 2010 Standardisation TC 88 : Insulation TC 89-WG12 : reflective insulation TC 127 : Fire safety in buildings Subjects

  3. General • Three meetings • Many participants (often more than 15) • All types of members represented • Good atmosphere

  4. Ongoing projectsstarted in 2008 • Durability • U value of warm roofs • Training tool Fire • Walkability • Fire “De Punt” • The role of thermal insulation: Myth and reality

  5. New projectsstarted 2009 • Acoustic tests for PU-boards, spay foam and sandwich panels • Myths and reality on “Multifoil”

  6. Project proposal 2010 Thick PU boards with better insulation value • Aim : • Provide evidence that gas open PU boards over 159 mm, have better performance than in the current standard, to be able to change standard • How: • Collect evidence inside members PU-Europe • Propose change in EN 13165 • Sample boards of 160 and 200 mm (Gas open) • Notified Body to confirm our evidence • Report of NB to CEN TC88 • Project • Costs : 20.000 euro • NB : proposal FIW, for good connections to TC88-WG1 • Timing : ready before june 2010 • Next steps • Decide Go/No GO

  7. StandardisationTC 88 • EN 15715: Mounting and fixing • out for formal vote, expected Q1 2010 • Results to be used on voluntary basis, not for CE-marking • Revision of EN 13165 serie • Sustainability • Dimensional stability • Extension of “Gas open” table • Gas tight definition • FPC/ITT frequencies • Need to fight for new properties : walkability and emmisivity • In situ standards : • Out for formal vote • ETICS • Discussion on ownership of mandate between EOTA and CEN • PU now active • PU still not in mandate

  8. StandardisationTC127 • SBI : • Small changes in standard (editorial) • Maybe change to change threshold from 0.2 to 0.4 for all classes, thanks to our support of work VTT • Room corner • Stopped discussion of RC as classification for now • External fire on roofs • Proposal for Extended applications (EXAP/DIAP document is nearly ready, but is “empty” • First proposal for “Single burning roof test” on principles

  9. StandardisationTC89-WG12 • Workshop 36 • Stopped by good coordinated action of insulants • TC89-WG12 • Develop standard on lab tests for Multifoils, based on classical methods, nearly ready • Develops standard on emmisivity, nearly ready • TC89-WG13 • New group, on “in-situ” testing • Has to be representative • Still in startup-phase, convenor to be selected

  10. Summary • Projects • Many projects ongoing • Work on “De Punt” : successful • Need to “cash” • Standardisation • Keep close watch on Revision: need coordinated action in countries in enquiry phase • TC89-WG13: select our choice of convenor, and support in all countries

  11. Thank you for your attention www.pu-europe.eu

  12. Walkability • Aim • To develop a method for walkability for standardisation purposes • Status • FIW started review of methods • PU-Europe proposal was made on basis of existing standard (EN 13793) • Next steps • Develop a test • Selection of method • Determine realistic parameters of test • Perform small series of feasibility tests (december 2009) • Check proposed method with wide series of materials • Publicize results via CEN TC88

  13. Durability • Aim : • provide insight of durability of PU and other insulants • Status • First phase desktop study finished • Little know in public literature • Second phase nearly ready • Results to be expected in 2009 • Long term performance • Real life sampling of old roof • One needs to be opened • One was opened : EPS inside • Next steps • Finalise study FIW • Find more real life samples to proof that PU is durable

  14. Training tool Fire • Aim: • Provide a modular set of papers on fire, to be able to meet specific requirements of targeted audience • Status • Targeted audience defined • Subject and modules defined • External consultant selected • Collecting information • Next steps: • Complete all information (anonymously) • Start writing first set of papers (December) • Expected completion Q2, 2010

  15. U value of warm roofs • Aim: • How does insulation perform “in situ” • Status • BRE/WTCB have defined project, with MW, PU, Multifoil and Multifoil+PU • Praktical arrangement ready • Work will start november/december • Next steps • Follow work carefully • Try to influence outcome in favour of PU

  16. Fire “De Punt” • Aim: • PU sandwich panels and spray foam were blamed to be the major cause of three casualties in “de Punt” was : Help NVPU • Status • First and second report of local authorities very negative for PU • DGMR report : different scenario could explain all phenomena, without significant contribution of PU sandwich panels. IBW simulations confirms this scenario • Dutch Safety board report : First reports wrong, DGMR right • Press release from NVPU • Next steps • Factsheet on “de Punt” (oktober in Dutch) • Get as much publicity as possible http://www.onderzoeksraad.nl/index.php/onderzoeken/brand-scheepsloods-de-punt-9-mei-2008/#rapporten

  17. Acoustic tests for PU-boards, spay foam and sandwich panels • Aim: • Provide good information on sound properties of applications with PU insulation • Status • Applications defined (11 build-ups, panels, spray and boards • Work started at APIP (Spain) • Next steps • Finalize tests • Report : including existing information (IVPU, ATEPA)

  18. Myths and realityon “Multifoil” • Aim: • Counteract all myths invented by ACTIS, and make this information available • Status • Myths identified • First reality cases ready • Next steps • Finalise all reality cases • Issue factsheet

  19. The role of thermal insulation: Myth and reality • Aim: • Counteract all myths invented by Rockwool, and make this information available for internal use • Status • Factsheet ready in English • Translated into Dutch • Next steps • Finalized • Other translations needed? National organisations

More Related