Small Diameter Bomb (SDB) Program Public Overview Briefing Current As of: 24 August 2001

Loading in 2 Seconds...

play fullscreen
1 / 15

Small Diameter Bomb (SDB) Program Public Overview Briefing Current As of: 24 August 2001 - PowerPoint PPT Presentation


  • 325 Views
  • Uploaded on

Small Diameter Bomb (SDB) Program Public Overview Briefing Current As of: 24 August 2001. Air Armament Center Lethal Strike JPO Eglin Air Force Base, FL. Disclosure & Disclaimer Statements. DISTRIBUTION A: This briefing has been cleared by AAC/PA (Public Affairs) for public release.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Small Diameter Bomb (SDB) Program Public Overview Briefing Current As of: 24 August 2001' - annora


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
small diameter bomb sdb program public overview briefing current as of 24 august 2001

Small Diameter Bomb (SDB)Program Public Overview BriefingCurrent As of: 24 August 2001

Air Armament Center

Lethal Strike JPO

Eglin Air Force Base, FL

disclosure disclaimer statements
Disclosure & DisclaimerStatements
  • DISTRIBUTION A: This briefing has been cleared by AAC/PA (Public Affairs) for public release.
  • This is briefing is UNCLASSIFIED.
  • This presentation is for information only. No US Government commitment to sell, loan, lease, co-develop or co-produce defense articles or services is implied or intended.
overview
OVERVIEW
  • PROGRAM BACKGROUND
  • OPERATIONAL REQUIREMENTS
  • PROGRAM SCHEDULE
program background
Program Background
  • MMC Mission Need Statement, ACAT Level II, Oct 97
    • Increase kills per sortie
      • Increase aircraft loadout
      • Accommodate current and future aircraft
    • Kill fixed, relocatable and mobiles targets
  • Milestone 0 decision Feb 98
    • Perform concept and trade studies
    • Evaluate both weapons and carriage systems
  • HQ ACC, AAC, and AFRL performed Analysis of Alternatives (AoA) 1998-2000
    • 22 approaches evaluated
    • Government and Industry proposed methods
program background con t
Program Background (con’t)
  • Air Force Research Lab Munitions Directorate (Eglin AFB FL) demonstrated technologies 1990-2000
  • Four Concept Study Contracts awarded 1999 ($250K each)
    • Boeing, Lockheed Martin, Northrop Grumman, Raytheon
    • Conducted trade studies, defined concepts
  • Four contracts modified 2000 (adding $1.3M each)
    • Develop and tested seeker and ATR algorithms
    • Characterized seeker/ATR in operational environment
    • Continue algorithm development
slide7
Miniaturized Munitions Concept

MMC Umbrella

Future

Phase I

Wide Area

Search Autonomous

Attack Miniature

Munition

(WASAAMM)

SDB

Fixed

Phase II

SDB Mobile

Common

Carriage System

SDB Program Covers Phase I and Phase II

requirements8
Requirements
  • Schedule #1 Priority: field systems soonest
  • Cost #2: Affordability, obtain price commitments
  • Performance #3
    • Phase I: GPS/INS-like accuracy (fixed/stationary)
    • Phase II: Seeker/ATR-like accuracy (mobile/relocatable)
  • 2 KPPs:
    • Loadout
      • 4 weapons per 1760 aircraft station is threshold
    • Interoperability
      • Common carriage system & interface across aircraft
      • Compatible with C4ISR infrastructure
requirements con t
Requirements (con’t)
  • Evolutionary approach to fielding systems
    • Phase I: Effective in GPS Jammed Environment
    • Phase II: Target Recognition for Autonomous Engagement in Limited Search Area
  • ORD Will Remain DRAFT until Milestone B decision
    • KPPs are only non-tradables
    • CAIV : performance trades between MS A and MS B
    • HQ ACC finalize performance “thresholds” after seeing cost & schedule impacts to program
requirements con t10
Requirements (con’t)
  • Aircraft Integration
    • Threshold Aircraft:
      • Phase I: F-15E
      • Phase II: F-15E, F-16C/D and B-1B
    • Objective Aircraft:
      • Phase I: A-10, F-16, F-117, F-22, JSF, B-1, B-52, B-2, UCAV
      • Phase II: A-10, F-117, F-22, JSF, B-52, B-2, UCAV
  • Aircraft Loadouts

A-10 F-15E F-16 F-22 F-117 JSF B-1 B-2 B-52 UCAV

Stations 4 3 2 2 2 2 24 16 12 TBD

Threshold* 16 12 8 8 8 8 96 64 48 TBD

Objective 48 36 24 12 24 24 288 192 144 TBD

*Threshold: 4 SDB weapons per 1760 interface

carriage system requirements
Carriage System Requirements
  • Commonality across all threshold and objective aircraft
    • Standard test equipment, training, containers, loading procedures, etc.
    • Compatibility with B-2 Smart BRA
  • MIL-STD-1760 interface
    • Minimize aircraft OFP impact, single update
    • Must support individual weapon targeting, fuze programming, weapon release initialization, weapon status reporting and weapon software reprogramming
  • Individual and ripple release against one or more targets
    • No single use devices for weapon ejection system
sdb program schedule
SDB Program Schedule

OCT

OCT

OCT

OCT

OCT

OCT

OCT

OCT

JAN

JAN

JAN

JAN

JAN

JAN

JAN

JAN

APR

APR

APR

APR

APR

APR

APR

APR

JUL

JUL

JUL

JUL

JUL

JUL

JUL

JUL

FY01

FY02

FY03

FY04

FY05

FY06

FY07

FY08

MS B

MS C2

MS C1

MS A

CA

RFP

System

Development &

Demo – 1

Phase 1

Fixed Target SDB

Common Carriage

System

GPS/INS Variant

Production

LRIP

CAD Development

& System Integration

Downselect

Phase 2

Mobile Target SDB

Sys

Int

Seeker/ATR

Advanced

Development

Seeker Design

& Maturation

System

Development &

Demo – 2

LRIP

= Decision Review

LRIP

Prod

development system integration
Development & System Integration
  • 2 Contractors = 24 months
    • Design and test warhead, fuze, GPS/INS guidance, carriage for fixed target SDB
    • Develop common aircraft ICD
    • Verify system level performance requirements are achievable for fixed target variant
    • Concurrent development and maturation of seeker/ATR algorithms
    • Develop and test Seeker/ATR
    • Verify costs are below threshold amount for fixed target SDB and delta for mobile target variant
further questions inquiry
Further Questions & Inquiry

Mail to: AAC/YV

Attn: Small Diameter Bomb Program Office

Suite 300

102 West D. Ave.

Eglin AFB FL 32542-6808

DSN Prefix: 872

Voice Phone: (850) 882-7321 x2233

Data Fax 850-882-0657