1 / 32

TECHNO CANADA INC.

TECHNO CANADA INC. 607,CHERITON CRESCENT EDMONTON,ALBERTA, CANADA T6R 2N3 Tel: + 1 780 430 1456 Fax:+ 1 780 435 1470 Webpage: www.t-c-i.ca Email: info@t-c-i.ca. OUR VISION

annice
Download Presentation

TECHNO CANADA INC.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TECHNO CANADA INC. 607,CHERITON CRESCENT EDMONTON,ALBERTA, CANADA T6R 2N3 Tel: + 1 780 430 1456 Fax:+ 1 780 435 1470 Webpage: www.t-c-i.ca Email: info@t-c-i.ca

  2. OUR VISION To be the most preferred independent Oil field service provider in the industry with world class standards of Health, Safety, Environment and Quality. OUR MISION To make world class Health, Safety, Environment and Quality a way of life within the company. To create a working environment in which our work force can achieve job satisfaction and career development. To provide our clients professional oil field services with the most qualified personnel and equipment. COMPANY PROFILE Techno Canada Inc. (TCI) is a company incorporated in Alberta under the laws of Canada in the year May 2002. TCI has been formed by professionals with a core background in the oil & gas upstream industry. Our experience ranges across the board from Well Testing, Nitrogen Services, Production Operations, Wireline Logging, Coil Tubing, Drill Stem Testing (Open Hole & Cased Hole) TCI personnel have been involved in major projects on shore and offshore.

  3. Surface Testing Mission Statement TCI is a Canadian Production Testing company currently operating in S E ASIA. Our equipment has been brought into the region. It is our aim to provide International Quality Testing Operations in SEA, fully compliant with Safety Standards, Business Management to Canadian business standards, at a realistic total project cost. The equipment list is as per the attached document which gives the ratings and Technical data on the different Surface test Equipment we have in the region. The test packages are suitable for onshore and offshore application. Any additional equipment or equipment not already brought into SEA can be mobilised from yards in Canada, India, Singapore or from Stockists in the Middle East depending upon the time frame of the project. TCI’s method of operation is to have the Crew Chief and Supervisors brought in from Canada and have the operators as local experienced testers. This we believe will provide the optimum value to our clients. We will have an Operations Co- ordinator who will be co-ordinating all the day to day operational requirements with the local clients at their HO. He shall be having single point responsibility for all non testing related issues like Logistics, Administration, Movement, Local Procurement etc. This enables the Crew Chief to focus on the critical testing related issues, and provides an optimum level of performance. We provide well test analysis using Fekete Field notes which is globally accepted, and AEUB compliant. Our equipment is rated to API, ASME, NACE, ANSI, and BIS standards as applicable. Each and every component of our test spread has fully traceable OEM documentation. Unless otherwise stated our equipment is NACE compliant. HSE is monitored by our General Manager with field level documentation for Near Miss, Field Level Risk Assessment (FLRA), Incident Reporting, Root Cause Analysis, and Tool Box Talk.

  4. ACCURACY TCI Production Services design and selection of test equipment, no matter how elaborate, is based upon certain fundamental requirements. All components should be sized so that anticipated maximum and minimum production will lie within the peak accuracy range of the equipment.. Career In Tci Careers Success without boundariesA tradition of excellence Each day, we help our customers find and produce oil and gas with respect for the environment. We're looking for men and women to join our global family in this effort.We know the work is tough. But, if you're ambitious, innovative, and hard working, a TCI career may be for you.We will require trained field hands as well as operators, logistics & administration personnel to help streamline our expanding operations. We hope you'll read more about what we have to offer and contact us for more information.

  5. INTRODUCTION AND SCOPE Techno Canada Inc. is a Canadian Company incorporated in Edmonton providing Oil Field Services, (Well Testing, Slick line,) to the oil patch . This Q.C. manual outlines the basic QC/QA practices and procedures necessary for the execution of turnkey projects as per international codes and standards and adopted. Conformance to quality standards shall also be assured as per the quality procedures / standards which may be mandated by purchaser contract. --CODES All TCI Equipment being purchased, owned, operated, leased, hired and utilized for oil well services shall meet as a minimum, the following CODES as applicable. This list is non-exhaustive. API-6A,14A, 6D,ASME-B31.3, SECVIII DIV-1, 16.5,NACE-MR-01-75,DNV-271, A-60,SI-289,SI-913,SI-2932,ABSA,NPD HSE POLICY STATEMENT TCI embraces a 100% safe culture and places the protection of people from injury or illness above all other management considerations. No employee will be expected, directed or encouraged to expose themselves or others to uncontrolled risk in order to satisfy a work related requirement. TCI recognizes and accepts its moral obligation to society and therefore will create work places that preserve the environment for future. All TCI employees are expected to embrace these values and nurture the 100% safe culture. Those whose work ethic conflicts with TCI’s philosophy in these critical areas will be coached into compliance or encouraged to find alternative employment. TCI will not waiver in its commitment to its values and principles.

  6. OIL FIELD SERVICES • Surface Well Testing / Early Production • Slickline • Drill Stem Testing • Workover Rig • Bottom Hole Sampling • Tubular Rental • Well Deliverability • Air Compressor • Seismic Data Acquisition

  7. Equipments with Specifications WELL TEST LAYOUT

  8. WELL TEST EQUIPMENTS 30” THREE PHASE SEPARATOR CHOKE MANIFOLD TEST FLOWHEAD EMERGENCY SHUT DOWN VALVE (ESDV)

  9. EQUIPMENT SPECIFICATIONS 1. Flow Head Hydraulically open flow wing valve, Bottom connection: 2 7/8” & 3 ½” tubing Minimum Id: 2.25”, 3 1/16”, 10,000 Psi Gate valve.  2. Co-flexip Hose Length: 33 & 45 feet, Pressure Rating: 10,000 psi, Service : Sour 3” 1502 End Connections Fitted with Saver Subs to Protect Threads 3. Choke Manifold Rating : 10,000 Psi / 5,000 Psi, Service : Sour API 6a, PSL 2, PR 3, Solid Block Gate Valve Fixed & Adjustable chokes, 5 Valve Configuration. 4. Data Header A)    10,000 Psi, 5,000 Psi, Data Headers complete with PG, TG, Injection points. B) Barton 10,000 Psi, 5,000 Psi Pressure Recorder, Dead Weight Tester. C) Methanol / PPD / glycol dosing pump. 5. 3 Phase, 1440 psi Separator Sizes : 30”, 36”, 42”, 48” @ 1,440 psi Rating : 600 Class ANSI, Service : Sour Daniel Senior Flow Meter, Halliburton Turbine Flowmeter ASME U Code Vessel, Dual Safety Relief System

  10. PIPING SAND SEPARATOR GROUND FLARE 3 HEAD SEA SNAKE BURNER

  11. 6. ESDV + ESDP System • 3”, 10,000 Psi / 5,000 Psi Hydraulic Operated Gate Valve, Air Fail Safe Closed, Hydraulic Single Circuit Control / ESD Panel complete with Hi-Lo Pilots, Remote Push Button Station, Hydraulic Actuator Quick Exhaust. Operating Air Pressure: 150 Psig • 7. Indirect Heater • Fire box rating : 1.5 / 2.5mm BTU/hr, Tube size : 20” NPS SCH 10 • Test pressure : 5,000 Psig, Tube Test Temperature : -50°C to 200°C • 8. 220 BBL Storage Tanks • Flexible hose connections, 2” steam circulation header insulated inlet, • C/w recirculation pump for crude circulation • 9. 100 BBL Surge Tank • Pressure rating : 50Psi, Flexible hoses rating : 150 Psi & 300 Psi • Dual Compartment with level gauges. • 10. 100 BBL Gauge Tank • Double compartment with level gauges • Pressure rating : Atmospheric, Flexible hoses rating : 150 Psi & 300 Psi • 11. Crude Oil Transfer Pumps • Ex-proof motor, starter, SS Internals with manifold • Discharge Pressure : 100 Psi, Discharge Volume : 5,000 BPD • 12. Oil and Gas Diverter Manifolds • To Divert Oil And Gas To Burner, Pressure Rating : 150 Psi & 300 Psi. • 13.Air Compressors • Total minimum 750 SCFM capacity, to be supplied by two units hose length: 400ft. • 14.   Flare Ignition System with Ground Flare Capacity – 5 MMSCFD. • Multi Head Burner, Auto Electric Ignition System

  12. COFLEXIP HOSE 48” THREE PHASE SEPARATOR INDIRECT HEATER

  13. 15. Piping 10,000Psi, 5,000 Psi & 2,000 Psi API 6a Piping With 1502, 602 & 206 Hammer Unions, Elbow’s Complete with all X-Overs. Service – Sour Service: Sweet 16. Chemical Injection Pump Operating Pressure: 50 to 100 psi Suitable for methanol, de-emulsifier, pour point depressant etc. 17. Sand Detector 2” 1502 hammer unions 10,000 psi rated to be suited upstream of choke manifold Electronic detection system with sand concentration output 18. Sample Bottles High pressure, Oil and Gas Gas : 3,000 Psi, 20 Ltrs. Oil : 10,000 Psi, 600 CC, IATA confirming 19. Mobile Laboratory Capable of crude oil volumetric calculations. Gas flow & gas gravity calculations. Salinity, H2S / CO2 analysis. Gas & Oil sampling system. 20. Safety Equipment Fire extinguishers, Gas Sniffers Portable CO2 and H2S Detection Equipments Hand held Radios and spare batteries

  14. 100 BBL SURGE TANK DIESEL/GAUGE TANK LONG BAILS TWILIGHT

  15. ESD System ESD Panel Push Button Station PRODUCTION TANKAGES

  16. SLICKLINE (DOUBLE DRUM) UNIT SPECIFICATION Basic configuration: Power Pack, 4-Cylinder, Diesel Driven, EX Zone 2 Operating Temperature: -20ºc to 40ºc Transport Dimension: 1865 X 1200 X 1420 Transport Weight: 1750 Kgs. Maximum Rating: 2500 Kgs. Drive System: Compressor, Belt Driven, Air Receiver Diesel Engine 4 Cylinder, (79 hp @ 2500 RPM) Liquid Cooled Engine, Natural Aspirated, Zone 2 Starting System Spring (Ex Zone 2 With Hand Crank, Suitable For 6 Liter Displacement Engine) Features: 4 Cylinders Diesel Engine 79 HP@ 2,500 RPM Zone 2 Rated Engine Air Operated Non-Asbestos Brake System 375 Bar (5,438 Psi) Closed Loop Hydraulic System Suitable For All Wire Sizes With Same Hydraulic System Creating Extreme Flexibility. Superior Sound Proofing And Thermal Insulation Properties. Easy to Maintain.

  17. SLICKLINE MEMORY LOGGING TOOL The Mini Logging Tool (MLT) is a compact version of a production logging tool. Designed with four sensors, the MLT can provide correlated data on pressure, temperature, depth and flow rates. The MLT is designed to be a modular tool. The 3 main modules are the platinum Resistant Temperature Detector (RTD) module, the Casing Collar Locator (CCL), and the Pressure/Flow module. The Platinum RTD provides a fast and high resolution temperature profile along the wellbore. The RTD module uses dual Platinum RTD's to measure temperature. Using dual RTD’s increases the sensitivity of the module, and negates the chances of the RTD being shielded by the MLT not being centred within the tubing string. The electromagnetic CCL measures depth by measuring the change in electromagnetic field that occurs at each casing, or tubing collar. Since the length of each joint is known, tool depth can be inferred from this depth, and correlated with the rest of the data. The Pressure/Flow module is economical in design. The external housing is universal. Different calibrated modules are then inserted into the external housing, depending on what pressure range the tool will be encountering. The MLT also uses a replaceable memory module. The memory module us connected to the top module within the string. Modules can be interchanged, allowing for the module to be changed out, and a second survey to be done with a new module, while the first module is downloaded. Any combination of modules can be used at one time. The only restraint is that only 1 Pressure/Flow module can be used at once, and it must be run at the bottom of the string.

  18. DST TOOLS WITH SPECIFICATION FULL BORE DST TOOL STRINGS ARE AVAILABLE IN 3.125” OD & 5.000” OD FULL BORE ONSHORE DST SCHEMATIC FULL BORE TEST PACKER

  19. DST TOOLS WITH SPECIFICATION FULL BORE BELOW PACKER SAFETY JOINT FULL BORE CIRCULATING VALVE

  20. DST TOOLS WITH SPECIFICATION FULL BORE GAUGE CARRIER FULL BORE HYDRAULIC JAR

  21. Seismic Data Acquisition Specification Line Telemetry System Ground Electronics Peripheral Equipment Cable Geophones Field Data Processing Plotter (s) Printers Shooting System Uphole (LVL Surveys) Survey Drilling Mechanized Equipment: Ardco Buggy Drills (4x4 wheeled), depth 50-60 meters Manual Rotary: SS 175 man portable ( modular), depth 50-60 meters Manual Hand Drill: PH5000 hand auger, depth 3-5 meters

  22. Bottom Hole Sampling TCI provides for bottom hole sampling to taking of representative reservoir fluid samples. The sampler can also be operated to take Single Phase Samples (SPS) from which samples are maintained at a pressure above the reservoir pressure, back to the PVT laboratory. Samples, when analyzed, provide data vital for the economic and technical evaluation of the reservoir. The sampler is run on wire line (slick or electric) and can be triggered by a mechanical firing device or surface firing via an electric line. Multiple samplers can also be run simultaneously. For transportation of samples, a range of cylinders (700 ml) can be supplied with pressure ratings of 5,000, 10,000 and 15,000 psi. For the USA market, DOT-approved cylinders are also available. OPERATION PARAMETERS: The material of construction of the sampling tool and transportation cylinders is NACE (National Association of Corrosion Engineers) approved for "SOUR GAS" service. Sample Volume : 600 ml, Max. Working Pressure : 15,000 psi at 180°C (356°F) Length : PDS: 12' 1" (3,680 mm), SPS: 16' 7" (5,054 mm) Weight : PDS: 61.6 lb (28 kg), SPS: 74.8 lb (34kg), Outside Diameter : 1-11/16 " (43 mm)

  23. BOTTOM HOLE SAMPLING Description: P.D.S. S.P.S. MK II, Sampling tool is a device for taking in-situ reservoir samples. The purpose of the is to provide a high quality representative sample which is maintained in single phase (using nitrogen gas). Subsequent PVT analysis of sample can provide data for economic and technical evaluation of a reservoir. The tool has been designed to operate in most environments and consistently produce representative samples regardless of the or conditions. Transportation box available. Volume: 600 ml Sample, 450 ml Nitrogen M.A.W.P:1035 Bar g @ 180 Deg C, (15,000 psi @ 356 Deg F) Material:17-4 PH STSTL (AISI 630), Aluminium Bronze CA104. All conform to N.A.C.E. MRO 175 latest review. Net weight: 34 kg (75 lb) Dimensions: Diameter: 1 11/16”(43 mm) Length: 16’ 7” (5054 mm)

  24. Well Deliverability Well Deliverability: Accurate forecasting of Gas Production requires integrating reservoir volumes (reserve), Sand Face and Wellhead Deliverability, Well Bore Hydraulic, Pipeline and compression capacity and other factors such as sales contracts. This is achieved by the understanding the inter-relationship between Reserves, Deliverability and Gas Gathering Systems.

  25. WELL DELIVERABILITY Well Deliverability: Reserves Evaluation Reservoir Engineering & Simulation Production Optimization Deliverability (IPR Curves) Open Flow Potential

  26. Premium Tubular Rental Services TCI are also providing our clients with the added facility of renting of Premium Tubular Connections for Well Testing. Specially required in the case of HPHT wells these Premium Tubulars are Gas Tight to pressure in excess of 10,000 psi with two step threads. Our inspectors will be available at site, to inspect the tubulars running services to ensure it’s done in the optimum means, with minimum Tripping and POOH operations for the specific services.

  27. MANAGEMENT CHART MD Project Co-Ordinator TECHNICAL Project Co-Ordinator OPERATIONS Project Co-Ordinator MARKETING G.Manager FINANCE COST ACCOUNTANT INSTRUMENTATION Engineer MECHNICAL Engineer Q.A. MANAGER GM. MARKETING INDIA GM. MARKETING SOUTH EAST GM. MARKETING CANADA ACCOUNTANT EXECUTIVE ENGINEERS (FIELD) ENGINEERS (FIELD) SAFETY OFFICER OPERATIONS COORDINATOR SUPERVISIORS CALIBRATION JR. ENGINEERS ( FIELD) LOGISTICS PROCUREMENT JODHPUR BASE DIGBOI (ASSAM) BASE CREW CHIEF CREW CHIEF SUPERVISIOR SUPERVISIOR OPERATORS OPERATORS

  28. TRACK RECORD

  29. TRACK RECORD

  30. Typical Well Testing Layout

  31. TYPICAL WELL TESTING LAYOUT

  32. SOUTH EAST ASIA : LOYANG OFFSHORE SUPPLY BASE BOX 5094,LOYANG CRESCENT, SINGAPORE 508988 CONTACT: SYED MOHAMMAD TF: +65 46 4706, Fax: +6546 4709 Cell: +65 9641 1475 HEAD OFFICE : 607,CHERITON CRESCENT EDMONTON, ALBERTA, CANADA T6R 2N3 Tel: + 1 780 430 1456 Fax:+ 1 780 435 1470 ELECTRONIC MEDIA: Email: info@t-c-i.ca, operations@t-c-i.ca himanshu@t-c-i.ca, ranjeet@t-c-i.ca Webpage: www.t-c-i.ca

More Related