Dive into the detailed mechanical design of the Proof Module for an observatory in February 2006 by the School of Ocean and Earth Science and Technology. Explore the main assemblies like Float Package, Cable Termination Frame, and more. Get insights into assembly, testing, and future plans for the project.

anngraham
Download Presentation

Aloha Phase 1 Mechanical Systems: Proof Module Design Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aloha Proof Module Design Cabled Observatory Mechanical Presentation School of Ocean and Earth Science and Technology February 2006

  2. Aloha Phase 1 Mechanical Systems Main Assemblies: Float Package Proof Module Cable Termination Frame Bottom Line: -Mechanicals have gone smoothly -Manufacturing and testing complete -Final assembly remains -Quick tour or three main assemblies

  3. Buoyancy Test • Float allows for the retrieval • of the proof module . • Link between termination frameand proof module will be cut byROV.

  4. Proof Module Electronics Housing Assembly Seawater Return Titanium Shackle Strong-back AT&TMUX Status: -Manufacturing completed -Passed pressure testing -Partially assembled Hydrophone Endcap (tube not shown) UH Electronics

  5. Proof Module Cable Termination Frame Status: -Manufacturing and tension testing complete -Waiting for Tyco/ODI cable harness for final assembly

  6. Termination Frame Tension Test -Frame is inverted inside railway

  7. 20Kpounds-Passed

More Related