Guidelines for Floor Pitching and Grouting with 3300 FS and 3500 Grout Epoxy Doc CH008

This document outlines the necessary steps for proper floor pitching and the application of 3300 FS and 3500 Grout Epoxy. It details the procedure for pitching flat floors to ensure efficient drainage with appropriate materials. Instructions include how to add additional slide photos if needed, and emphasizes the importance of screeding and pitching with the specified grout for optimal performance. Follow these guidelines to achieve the best results in flooring applications.

Download Presentation

Guidelines for Floor Pitching and Grouting with 3300 FS and 3500 Grout Epoxy Doc CH008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. If additional slides are needed for photos, select slide 2 in Slide Sorter View and press Ctrl-D. Flat floor to be pitched prior to application of 3300 FS DOC. NO. CH008

  2. If additional slides are needed for photos, select slide 2 in Slide Sorter View and press Ctrl-D. Pitching to drain with 3500 Grout Epoxy Grout CH008

  3. If additional slides are needed for photos, select slide 2 in Slide Sorter View and press Ctrl-D. Screeding 3500 Grout Epoxy Pitching Grout CH008

  4. If additional slides are needed for photos, select slide 2 in Slide Sorter View and press Ctrl-D. 3300 FS over 3500 Grout Pitching Grout CH008