An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BioWire Progress ReportWeek Two Orr Ashenberg, Patrick Bradley, Connie Cheng, Kang-Xing Jin, Paula Nunes, Danny Popper, Sasha Rush

  2. What we did last week • Ordered BioBricks • Experiments • Miniprepped the BioBricks • Modeling • Photolithography

  3. Modeling

  4. Photolithography • Went through microprinting process for mammalian cells in Kit’s lab. • Still checking out specific proteins to use in modifying process for E. Coli (mannose to adhere, BSA to resist adhesion) • In process of finding out CAD rules to design our own masks and stamps.

  5. Update on the Weiss Circuit • They are working on the same PPG (propagating pulse generator) design as us. • They have simulations done, but no experimental data. • Their simulations show potential back-propagation and self-signaling.

  6. New Ideas • Have two signaling mechanisms to create circle or line oscillator • Lux with either Las or Rh1 • Would require two “routers” to receive the old signal and begin the new one. • Challenges: Designing another signaling pathway, crosstalk • Use one signaling pathway to create line oscillator • Bounce the pulse through the wire with delays on the ends • Use an intracellular lactonase • Allow for faster AHL degradation to reduce noise and potential back-propagation.

  7. Schedule (old) • Week 1 (6/6): Project Choice and Design • Week 2 (6/13): Test AHL receiver/sender • Week 3 (6/20): Test sender+receiver and repressor • Week 4 (6/27): More tests • Week 5 (7/4): Finish testing • Week 6 (7/11): Test cell signaling density; photolithography done • Week 7 (7/18): Construct IFFL (incoherent feed-forward loop) • Week 8 (7/25): Test it • Week 9 (8/1): “ • Week 10 (8/8): “ • Week 11 (8/15): “ • Week 12 (8/22): “

  8. Schedule (new) • Week 1 (6/6): Project Choice and Design • Week 2 (6/13): Got parts and set up tests • Week 3 (6/20): Get remaining parts; Test all • Week 4 (6/27): Tests we couldn’t get to last week • Week 5 (7/4): Finish testing • Week 6 (7/11): Test cell signaling density; photolithography done • Week 7 (7/18): Construct IFFL • Week 8 (7/25): Test it • Week 9 (8/1): “ • Week 10 (8/8): “ • Week 11 (8/15): “ • Week 12 (8/22): “