Installation phases for the supporting systems of the CLEX Modules [F-610 contract ]

Loading in 2 Seconds...

play fullscreen
1 / 7

Installation phases for the supporting systems of the CLEX Modules [F-610 contract ] - PowerPoint PPT Presentation


  • 109 Views
  • Uploaded on

Installation phases for the supporting systems of the CLEX Modules [F-610 contract ]. Nick Gazis. *Thanks to Michail Anastasopoulos for the input. Phase 1 : FIRST batch delivery for the F-610. LAB. CLEX. B1. B2. IB1. EB2. EB1. Main Beam Type-0. Main Beam Type-0.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Installation phases for the supporting systems of the CLEX Modules [F-610 contract ]' - amos


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Installation phases for the supporting systems

of the CLEX Modules

[F-610 contract ]

Nick Gazis

*Thanks to Michail Anastasopoulos for the input

phase 1 first batch delivery for the f 610
Phase 1: FIRST batch delivery for the F-610

LAB

CLEX

B1

B2

IB1

EB2

EB1

Main Beam Type-0

Main Beam Type-0

Drive Beam Type-0

Drive Beam Type-0

25-31 July 2013: Operation in the LabBlank assembly of the B1 and B2 supporting system in the Lab for acceptance measurements

No operation in CLEX

phase 2 first installation in clex
Phase 2: First installation in CLEX

LAB

CLEX

B1

B2

EB4

EB3

IB1

EB2

EB1

Main Beam Type-0

Main Beam Type-0

Drive Beam Type-0

Drive Beam Type-0

23-27 September 2013: Operation in the LabDisassembly of the B1 supporting system

07-11 November 2013: Operation in CLEXInstallation of the B1 supporting system in CLEX

phase 3 second batch delivery for the f 610
Phase 3: SECOND batch delivery for the F-610

LAB

CLEX

C

B1

B2

EB4

EB3

IB1

EB2

EB1

Main Beam Type-1

Main Beam Type-0

Main Beam Type-0

Drive Beam Type-1

Drive Beam Type-0

Drive Beam Type-0

[Indicative dates]09-20 December 2013: Operations in the Lab -Move of the B2 supporting system, -Blank assembly of the C supporting system in the Lab for acceptance measurements

No operation in the CLEX

phase 4 final installation in clex
Phase 4: Final installation in CLEX

LAB

CLEX

B1

C

B2

EB3

EB2

IB2

EB4

EB1

IB1

Main Beam Type-1

Main Beam Type-0

Main Beam Type-0

Drive Beam Type-1

Drive Beam Type-0

Drive Beam Type-0

2014: Operations in the Lab Disassembly of the B2 and C supporting system

2014: Operation in CLEXInstallation of the B2 and C supporting systems in CLEX

schematic index
Schematic Index

: Vertical Linear Actuator

Supplementary Slide

: Radial Linear Actuator

: Master Cradle

: Girder

: Slave Cradle

: Back Support (3D model entitled “CAD000322889.stp” in EDMS 1264954

: Mechanical Articulation Point

: Extremity bench

EB#

: Interconnection bench

IB#

overall schemati c representation of the supply
Overall schematic representation of the supply

Master cradles

Drive Beam Type-0

Drive Beam Type-0

Drive Beam Type-1

Supplementary Slide

Slave cradles

Master cradles

Main Beam Type-0

Main Beam Type-0

Main Beam Type-1

Slave cradles

moduleType 0

module

Type 0

module

Type 1