Cosumnes River Boulevard/I-5 Interchange and Extension Project

Cosumnes River Boulevard/I-5 Interchange and Extension Project. Cosumnes River Boulevard. Cosumnes River Boulevard/I-5 Interchange and Extension Project Staff Recommendations: Approving the plans and specifications Appropriating state, federal, private & local funds

ameliastark
Download Presentation

Cosumnes River Boulevard/I-5 Interchange and Extension Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cosumnes River Boulevard/I-5 Interchange and Extension Project Cosumnes River Boulevard

  2. Cosumnes River Boulevard/I-5 Interchange and Extension Project • Staff Recommendations: • Approving the plans and specifications • Appropriating state, federal, private & local funds • Awarding a construction contract with Teichert Construction Inc. • Approving a Professional Services Agreement with The Hanna Group to provide construction management, inspection and construction staking • Approving a Professional Services Agreement with Mark Thomas and Company to provide additional design and support during construction

  3. January 8, 2013

  4. Project Alignment Delta Shores Circle West Street A E Drive 24th Street D Drive Street B Franklin Boulevard Morrison Creek

  5. Cosumnes River Boulevard/I-5 Interchange and Extension Project The Project History: • Planned since the 1960’s • Originally proposed as Caltrans’ State Route 148 or the south beltway before Caltrans relinquished rights in the early 1980’s • In the early to mid-90’s the City constructed the portions of the roadway between State Route 99 and Franklin Boulevard

  6. Cosumnes River Boulevard/I-5 Interchange and Extension Project Project Goals: • Close a 3.5 mile roadway gap • Improve transportation circulation in South Sacramento • Reduce existing congestion along Mack Road • Improve air quality by reducing vehicle miles travelled • Facilitate the development of the 800 acres of Delta Shores

  7. January 26, 2012

  8. Will contain approximately 4600-5300 residential • homes & commercial/retail developments

  9. Cosumnes River Boulevard/I-5 Interchange and Extension Project Project Schedule • Complete and open I-5 Interchange in Summer 2014 for Delta Shores development • Complete and open the remainder of the project by Fall 2015

  10. Cosumnes River Boulevard/I-5 Interchange and Extension Project Questions?