1 / 21

Two Sources of Error

Module 6: Uncertainty Don’t just calculate—first think about sources of error, and don’t double-count errors. Two Sources of Error. Sampling How/where/when/who makes the measurements Population Actual variability in what you are measuring. Measurement error specific to…. Operator

alodie
Download Presentation

Two Sources of Error

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Module 6:UncertaintyDon’t just calculate—first think about sources of error, and don’t double-count errors module 6

  2. Two Sources of Error • Sampling • How/where/when/who makes the measurements • Population • Actual variability in what you are measuring module 6

  3. Measurement error specific to… • Operator • Instrument • Lab • Procedure • Standard • Time (day of week, year, season) • Measurement level (harder to measure at low concentrations) module 6

  4. Population Error • Ideally, estimate some aspect of homogenous “clump” of air, water, people • If population is totally homogenous, only one measurement is necessary • The more variability in the population, the more measurements you need module 6

  5. Minimizing the effect of population uncertainty • Careful sampling plan, designed to include measurements from all “over” the distribution • Sampling plan to measure smallest “homogenous” parts of environment as possible • Careful adherence to identical procedures module 6

  6. QC measurements designed to… • Identify where errors occur • Quantify errors (difference from “reality”) • Save $ by improving program • Produce estimates of how certain your conclusions can be… • …therefore allowing decisions based on what you really “can” know module 6

  7. PM QC Results • Collocated • Flow rate checks done with routine standard • Flow rate checks done with an external standard • PEP intercomparisons of external instrument and lab • What to do with each? module 6

  8. How EPA Summarizes QC • First, estimate uncertainty for each site • Use collocated results to calculate confidence interval for precision (CV) • Start with RPD (diff/mean) • Always use same pair and order module 6

  9. See P&B DASC with PM Data module 6

  10. PM2.5 Precision Estimate (40 CFR 58 App. A eq’n 11) module 6

  11. 90% confidence limit for precision = 7.7% • Average over quarter = x microg/m3 +- 8% (with 90% confidence, from precision error alone) • Can use this as part of overall uncertainty estimate • Combine with bias estimates from flow rate and PEP audits module 6

  12. To estimate bias… • Use PEP audit results, if available • Use any comparisons that are independent as possible • Use DASC PM2.5 Bias (Current PEP) tab • Calculates upper and lower 90% confidence intervals module 6

  13. UCL and LCL(upper and lower confidence level) module 6

  14. What does this mean? • UCL is ~ 10% • LCL is ~ -10% • Uncertainty of bias about 10% • Average bias of 7% could really be 7.7, or about 8% module 6

  15. Combining precision and bias? • For rough estimate: square root of sum of squares • Start with d=diff/mean for all QC checks • Calc STDEV of each set of d’s • Square each STDEV • Add squares • Take square root, see if it makes sense! module 6

  16. Precision for qrtr 1 of 2003 Collocated pairs, so PRECISION estimate (if A is not consistently higher/lower than B) module 6

  17. Bias for 2003, based on independent checks module 6

  18. Square Root of Sum of Squares module 6

  19. Presenting Uncertainty • Use error bars or upper, lower lines in graph module 6

  20. Uncertainty for Gaseous Methods • Simpler than PM • RPD between known and measured for automated and manual checks • Estimates validated with results of independent audits • QC checks produce estimates that include both precision and bias error module 6

  21. Summarizing Uncertainty:COMMON SENSE first! • “Highest” estimate or worst-case calculation from results of independent audits (that encompass both precision and bias) • Uncertainty estimate should encompass (already include the error from) your internal assessments, so do not double-count results module 6

More Related