1 / 22

Process Improvement Ideas

Process Improvement Ideas. Abe Taleb José G. Rodríguez. Kaizen Events. Small process improvements that can be set up and executed in a short period of time. Usually accomplished at little or no expense, without sophisticated techniques or expensive equipments.

aleron
Download Presentation

Process Improvement Ideas

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Process Improvement Ideas Abe Taleb José G. Rodríguez

  2. Kaizen Events • Small process improvements that can be set up and executed in a short period of time. • Usually accomplished at little or no expense, without sophisticated techniques or expensive equipments. • Focus on simplification by breaking down complex processes into their sub-processes and then improving them.

  3. Customer Needs

  4. Specifications

  5. Selection of Improvement Ideas • Categories: • Ease of implementation • Cost benefit ratio • Time to implement • Customer priority • Weights were assigned to each of the categories. Based on these weights, 10 were pre-selected. • After customer discussions, this selection process concluded with 5 improvement opportunities.

  6. Rating Metric Weight 5 3 1 Ease of implementation 0.20 Easy to implement Moderately difficult to implement Difficult to implement Cost/benefit ratio 0.20 Low ratio Medium ratio High ratio Time to implement 0.10 <6 hrs <12 >24 hrs Customer Priority 0.50 Very important Moderately important Less important Rating Scale • Due to time constraints, the team will only be able to execute at most three out of these five.

  7. Reduce the # of boxes that go from Pack to ADM • Shipping Boxes reach the ADM with certain frequency. • This must be reduced in order to • minimize the number of late shipments. • reduce waste associated with personnel having to take these boxes back to shipping.

  8. Reduce the # of boxes that go from Pack to ADM • Visual aids specifying which conveyor is for totes and which one is for boxes, could potentially reduce this. • This will increase accuracy, serving as an aid in the decision making process. • Cost: <$100 • Time to implement : <6 hrs

  9. Reduce the # of boxes that go from Pack to ADM

  10. Redesign Labeling of Slots in ADM • Order accuracy and inventory accuracy are metrics in yellow. • ADM has the lowest inventory and order accuracy (<81%). • It is assumed that the number of errors in replenishment due to poor label design is large.

  11. Redesign Labeling of Slots in ADM

  12. Redesign Labeling of Slots in ADM

  13. Redesign Labeling of Slots in ADM • In the ADM, these metrics can be increased by redesigning the labeling of the slot locations. • Cost: <$500 • Time to implement: <12 hrs

  14. Redesign Labeling of Slots in ADM 12 08 09 10 11

  15. Redesign Labeling of Slots in ADM 06 01 02 07 03 04 05 04 03 02 01 05

  16. Design new method to reduce idle time in PTL • Currently when orders are slow pickers login and logout from each section with a single tote. • Process is very wasteful. • If a worker logs in picks one or two totes, checks induct, then logs back out again this triples picking time. • Workers could be used in other areas.

  17. Design new method to reduce idle time in PTL • Let a small queue be generated at each PTL divert when orders are slow. • More of a mentality switch then anything else. • Cost: Minimal • Time to implement: <1 week

  18. Fix Shipping Conveyor • Boxes to be shipped either are turned over or are to far to a side of the conveyor to be read by the Quantum Sorter. • Turned over boxes are either placed on conveyor upside down or flipped during transit. • Results in boxes to be sorted by hand. • Reaching into bins creates poor ergonomic conditions.

  19. Fix Shipping Conveyor • Smaller bins for boxes that can not be read. • Visual reminders to place box on conveyor tracking number side up. • Mechanical solution to prevent boxes from being flipped over in transit . • Will increase productivity of workers. • Cost: $20 - $500 • Time to implement: <24 Hrs

  20. Dedicated Time for Bulk Picking • Workers bulk picking often prevent other workers from picking. • No apparent benefit from picking bulk during the day. • 48 hour time goal for bulk would allow for picking to be delayed. • One idea is to only pick bulk in the morning when orders are slow.

  21. Dedicated Time for Bulk Picking • Another idea is to pick bulk from 3am to 6am when there is very little going on in facility. • Would only require rescheduling of a small handful of workers. • Productivity would increase across the board. • Cost: Minimal • Time to implement: <1 week

More Related