1. Teegalem Canal (48.15 km) 62,000 Ac PowerPoint Presentation
Download Presentation
1. Teegalem Canal (48.15 km) 62,000 Ac

Loading in 2 Seconds...

play fullscreen
1 / 9

1. Teegalem Canal (48.15 km) 62,000 Ac - PowerPoint PPT Presentation


  • 1077 Views
  • Uploaded on

VELIGONDA PROJECT. 1. Teegalem Canal (48.15 km) 62,000 Ac. 2. EMC (199 km) 2,45,000 Ac. 3. Udayagiri Canal 52,000 Ac. In fall . 4. West Branch Canal 51,000 Ac. Regulator. 5. Supplementation 27,500 Ac.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '1. Teegalem Canal (48.15 km) 62,000 Ac' - aleda


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

VELIGONDA PROJECT

1. Teegalem Canal (48.15 km) 62,000 Ac

2. EMC (199 km) 2,45,000 Ac

3. Udayagiri Canal 52,000 Ac

In fall

4. West Branch Canal 51,000 Ac

Regulator

5. Supplementation 27,500 Ac

TOTAL 4,38,000 Ac

Nallamalasagar

FRL +244.00m

Approach

Cap. 53.85 TMC

Channel

100 m

PACKAGE-2

Peddi Reddipally

Teegaleru Canal

Reservoir

(27.33 cumecs)

Flood Flow Canal

Foreshore of

48.15 km

FRL +188m

Tunnel

Srisailam

Sunkesula Gap

62000 Ac

Cap. 2.023 TMC

Reservoir

(PACKAGE-3)

328 Cumecs

Gottipadia Gap

MDDL +834 ft

18.80 km

Eastern Main Canal

FRL +885 ft

23.20 km

Kakarla Gap

BL +842 ft

km 24.45

Link

Udayagiri

2,45,500 Ac

PACKAGE-1

Channel

Branch Canal

199 km

PACKAGE-4

9.6 km

17.5 km

Lift I

0.00

Turimella Reservoir

52000 Ac

FRL +235 m

Cap. 2.453 TMC

GB Reservoir

FRL +254.5 m

Lift II

Cap. 0.415 TMC

Western

Branch Canal

Lift III

(51,000 Ac)

Under progress

Racherls Tank

Western

FRL +237.3 m

Canal

22.70 km

slide6

VELIGONDA PROJECT

Pkg.No. 1 : Construction of Tunnel from TBM from Kollamvagu in the foreshore of Srisailam Reservoir up to Guntur – Kurnool road including construction of head regulator, approach channel, exit channel.

Name of the Contractor : M/s. SABIR,SEW&PRASAD(JV)

Agreement Amount : Rs. 624.60 Crs.

Agreement Date : 20-08-2005

Period of completion : 36 Months (12 milestones)

Target date of completion : 8/2008

  • Investigation : in progress
  • Designs : yet to be started
  • Execution : Yet to be started
  • Expenditure : 2005-2006 - Rs. 31.45 Crs. (Inc. Mob. Advance)
  • Land Acquisition : Required 65.86 Acres, Acquired 45.86 Acres
  • Bottlenecks : Forest clearance is awaited
slide7

VELIGONDA PROJECT

Pkg.No. 2 :Closing of Sunkesula Gap, excavation of feeder channel and Teegaleru canal including construction of CM & CD works and distributary system for 62,000 Ac.

Name of the Contractor : M/s. Gayatri-Jayaprakash (JV)

Agreement Amount : Rs. 254.50 Crs.

Agreement Date : 09-11-2004

Period of completion : 30 Months (10 milestones)

Target date of completion : 8/2007

  • Investigation : Completed
  • Designs : yet to be started
  • Execution : in progress
  • Qty. of earth work done : 55,000 cum against 61,10,000 cum.
  • Expenditure : 2004-2005 - Rs. 12.73 Crs.
  • 2005-2006 - Rs. 42.76 Crs.
  • Cum. Exp. Inc. Mob. Adv. only - Rs. 55.49 Crs.
    • Land Acquisition : Required 6317 Acres, Acquired 378 Acres
slide8

VELIGONDA PROJECT

Pkg.No. 3 :Closing of Gottipadia Gap and excavation of Gottipadia canal including construction of CM & CD works and distributary system for 9500 Ac.

Name of the Contractor : M/s. Larsen & Toubro Ltd.,

Agreement Amount : Rs. 380.00 Crs.

Agreement Date : 08-11-2004

Period of completion : 30 Months (10 milestones)

Target date of completion : 8/2007

  • Investigation : Completed
  • Designs : in progress
  • Execution : in progress
  • Qty. of EW done : 369829.22 cum against 326250 cum
  • Qty. of concrete work done : 52,653 CuM against 108958 CuM.
  • Expenditure : 2004-2005 - Rs. 18.93 Crs.
  • 2005-2006 - Rs. 55.30 Crs.
  • Cum. Exp. Inc. Mob. Adv. only - Rs. 74.23 Crs.
    • Land Acquisition: Required 3899.02 Acres, Acquired 1303.28 Acres
slide9

VELIGONDA PROJECT

Pkg.No. 4 : Closing of Kakarla Gap by construction of NOF dam, excavation of link canal and part of eastern canal together with distributary system including CM & CD works for 47,500 Ac.

Name of the Contractor : M/s. SCL – BSCPL (JV)

Agreement Amount : Rs. 206.80 Crs.

Agreement Date : 20-08-2005

Period of completion : 36 Months (12 milestones)

Target date of completion : 8/2008

  • Investigation : 18.90 Km length against 53.26 Km
  • Designs : in progress
  • Execution : Yet to be started
  • Qty. of earth work done : 35,000 cum against 86,350 cum
  • Expenditure : 2005-2006 - Rs. 17.80 Crs. (Inc. Mob. Advance)
  • Land Acquisition : Required 2716.56 Ac., Acquired 171.45 Ac.
  • Tunnel : Decision has to be taken for the ultimate stage i.e, 2nd tunnel of 9.2 M dia are increasing the existing tunnel of 7 M dia to 11 M dia.