SAN FRANCISCO BAY OPERATIONAL FORECAST SYSTEM

SAN FRANCISCO BAY OPERATIONAL FORECAST SYSTEM. Background and Planning Meetings Historical Perspectives Recent Perspectives Key Hydrodynamic Processes PORTS Suggested Approaches Next Steps Richard A. Schmalz July 19, 2010. Background and Planning Meetings.

alden-smith
Download Presentation

SAN FRANCISCO BAY OPERATIONAL FORECAST SYSTEM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAN FRANCISCO BAY OPERATIONAL FORECAST SYSTEM Background and Planning Meetings Historical Perspectives Recent Perspectives Key Hydrodynamic Processes PORTS Suggested Approaches Next Steps Richard A. Schmalz July 19, 2010

  2. Background and Planning Meetings October 9, 2009 CSDL Preliminary Planning Meeting IOOS/RA Reviews California Coastline USGS San Francisco Bay Modeling Review May 6, 2010 CSDL Follow-up Planning Meeting FVCOM User Workshop Review California Current System Modeling Review AGU Ocean Sciences Meeting Abstract Reviews

  3. Historical Perspective NOS 1979-1980 Circulation Survey Report 7 R.T. Cheng, USGS retired, OFS—2d TRIM Customized windfield provided by F. Ludwig, Stanford University website semi-operational---R. Smith, USGS

  4. Recent Perspectives • NOS Historical Circulation Survey Data Restoration CSDL Tech Note 9. • Movement towards 3d unstructured grids in recent model studies: unTRIM, SUNTANS, and FVCOM. • San Francisco Bay-Delta UnTRIM Model Calibration Report, California Department of Water Resources, December 2008.

  5. Key Hydrodynamic Processes Upwelling/Downwelling dynamics—California Current (ROMS OSU and JPL models) Internal wave generation—nonhydrostatic SUNTANS and ROMS coupling (Fringer et al., Oceanography, 2006) Shelf-Bay interaction Salinity intrusion and Delta dynamics Wetting-drying of tidal flats in the northern Bay Inundation associated with coastal storms

  6. USGS/NOS Real-time C/T Sensors Plans for USGS real-time C/T sensor network Proposed addition of PORTS C/T sensors at all PORTS water level gauges pending funding Cooperation with USGS in station location selection and maintenance of selected stations

  7. VDATUMCalifornia Coast Grid

  8. VDATUM Grid in the vicinity of San Francisco Bay

  9. VDATUM San Francisco Bay Bathymetry

  10. Suggested Phase I Tasks • Use FVCOM Version 3.1 • Modify VDATUM California grid using SMS • Consider Apr-May 1979 and Sep-Oct 1980 for initial tidal and hindcast simulations

  11. USGS/NOS Modeling Cooperative Efforts • Phase I consistent with recent unstructured grid modeling approaches, builds on VDATUM grid and bathymetry, and uses recovered historical NOS data employed by Ralph Cheng, USGS, for comparison of modeling results. • Unstructured modeling approach allows NOS FVCOM modeling approach to be coordinated with unTRIM modeling efforts by Jon Burau, USGS, Sacramento. • Assistance and cooperation in the development of the Delta inflow boundary conditions, particularly during the historical 1979-1980 hindcast.

  12. Suggested Phase II Tasks • Extend the tidal and hindcast periods from April 1979 – October 1980. • Perform formal tidal and hindcast skill assessments. • Efforts underway with USGS: Ralph Cheng, Jeff Gartner, and Jon Burau to obtain CTD and current meter datasets.

  13. Suggested Phase III Tasks • Transfer and couple San Francisco Bay FVCOM to shelf forecast models at NCEP • ETSS/G-NCOM • NOS West Coast Shelf Model • Perform formal skill assessment of NCEP coupled San Francisco Bay FVCOM nowcasts and forecasts

  14. Next Steps • Review and edit NOS Circulation Survey Current, CT, and CTD datasets • Obtain historical water level data 1979-1980 • Obtain water level and PORTS current station HA results • Perform HA (15-day) on historical current data • Revise VDATUM grid and bathymetries • Develop additional water level, current, and density station locations--- initially measure conductivity at PORTS water level stations.

  15. Stakeholders

  16. High Level Project Schedule and Milestones

  17. Resource Requirements for Project Planning (High Level) • .