rehabilitation of flat creek teton county wyoming planning design and implementation n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Rehabilitation of Flat Creek, Teton County, Wyoming; Planning, design and implementation PowerPoint Presentation
Download Presentation
Rehabilitation of Flat Creek, Teton County, Wyoming; Planning, design and implementation

Loading in 2 Seconds...

play fullscreen
1 / 24

Rehabilitation of Flat Creek, Teton County, Wyoming; Planning, design and implementation - PowerPoint PPT Presentation


  • 83 Views
  • Uploaded on

Rehabilitation of Flat Creek, Teton County, Wyoming; Planning, design and implementation. A cooperative effort between: Trout Unlimited, Jackson Hole Chapter Teton Conservation District Town of Jackson Teton County Wyoming Game and Fish Department HabiTech, Inc Others. Project Goal.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Rehabilitation of Flat Creek, Teton County, Wyoming; Planning, design and implementation' - alda


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
rehabilitation of flat creek teton county wyoming planning design and implementation
Rehabilitation of Flat Creek, Teton County, Wyoming;Planning, design and implementation

A cooperative effort between:

Trout Unlimited, Jackson Hole Chapter

Teton Conservation District

Town of Jackson

Teton County

Wyoming Game and Fish Department

HabiTech, Inc

Others

project goal
Project Goal

Reduce icing and winter flooding of Flat Creek through stream improvements which allow the creek to approach its fisheries and ecological potential

project tasks
Project Tasks

PHASE 1:Conduct a planning and feasibility study to determine the aquatic habitat limitations of Flat Creek and recommend likely concepts and strategies for rehabilitation;

PHASE 2:Conduct a detailed siting and design study leading to the recommendation of specific rehabilitation treatments and the submittal of necessary documents to the appropriate state and federal agencies for permitting purposes;

PHASE 3:Implement the recommended and permitted rehabilitation treatments and provide a post implementation evaluation.

project priorities
Project Priorities
  • Winter icing and flooding;
  • Discontinuing thaw well use and not adding additional thaw wells;
  • Storm water runoff storage in stream banks and sediment load management;
  • Fish habitat
what s been done to date
What’s been done to date?
  • Completion of 2 reaches
  • Monitored & Analyzed Results on first 2 reaches
    • 1st reach flood
    • 2nd reach with stood coldest winter in recent history
  • Preliminary design of Karnes Meadow Reach
  • Site specific survey and hydraulic modeling
  • Development of improvement concepts
reach 1 downstream of hwy 191 to high school road4
Reach #1Downstream of Hwy 191 to High School Road
  • No Frazil ice production during extreme cold (-10°F)
  • Surface Ice Formation
reach 1 downstream of hwy 191 to high school road5
Reach #1Downstream of Hwy 191 to High School Road
  • Flood
  • What did we learn
  • Will it happen again