1 / 17

Conducting a Trip Generation Study

Conducting a Trip Generation Study. When to Collect Data. Not covered by the ITE land use classification Location is in CBD Significant multi-modal component Size of site is not within ITE data range Insufficient sample size Inadequate statistical confidence

albina
Download Presentation

Conducting a Trip Generation Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Conducting a Trip Generation Study

  2. When to Collect Data • Not covered by the ITE land use classification • Location is in CBD • Significant multi-modal component • Size of site is not within ITE data range • Insufficient sample size • Inadequate statistical confidence • Inconsistent from sites included in existing database (age of res., worker shifts, diff. ind. Var.) • Multi-use development • Questioned by professionals or local officials

  3. Sample Size Determination • Establish local trip generation rateat least 3 sites preferably 5 • Validate ITE trip generation rateat least 3 sites • Combine local data with ITE dataat least 2 sites • Submit data to ITEat least on site

  4. Site Selection • Transferrable (dev. Size, development mix, location w/r to network and dev. Patterns) • At least 85% occupancyAt least 2 yrs old • Independent variable data available • Can isolate site for counting (no shared parking, no shared driveways, limited ped traffic from nearby, limited transit, no through traffic) • Security • Single land use activity • No construction • Owner permission

  5. Independent Variable Selection • Available • Variable size would affect trip generation • Should be accurate not estimated or derived • Currently used in manual

  6. Development Data Requirements • Site description • Square footage/units • Percent occupancy • Site acreage • Location (CBD, suburban, rural) • Name and description of principal use • Site plan • Adjacent street traffic volumes

  7. Survey Periods • Automatic count • 7-day period ideal • 1-day period at a minimum • 2-day preferable • Manual counts • 2-hours for each peak • Season • No-variation then pick average day • Variation then pick 30th or 50th highest hour • Time of survey should represent typical activity (good weather, no big sale, etc.)

  8. Conducting the Study • Directional volumes • 15-minute periods • Two or more days of peak period counts • Adjacent street hourly traffic counts for establishing peak period time • Concurrent counts • Site data from owners • Verify automatic counts with short-period manual counts • If needed, vehicle classification and vehicle occupancy

  9. Establishing a Local Trip Generation Rate of Equation • Hypothesis for why local conditions are unique • Confirm that local data justify local trip generation rate/equation • 3 sites (5 preferable) • Difference of average greater than +/- 15% • Local data consistent • Rate or equation satisfies statistical standards • For ave: • At least 3 data points • Std/ave <= 1.10 • For Equation: • At least 4 data points • R2 >=0.75

  10. Validation of Trip Generation Rates/Equations for Local Use • STEP 1: Collect data at 3 sites or more • STEP 2: Analysis of the local data, comparing to ITE • ITE data valid if… • Criteria 1: trip generation rate for local site within +/- std • Criteria 2: at least one site rate higher and one lower OR all with 15% • Criteria 3: local data generally fall within ITE scatter • Criteria 4: common sense • If all of the criteria of STEP 2 are not met then consider local rate or equation

  11. Combining Trip Generation and Local Data • Combine if ITE and local rates within 15% • Does not give precise std or regression equation • Sum trip ends(ITE) = weighted average * average X * number of studies • Sum independent variable units (ITE) = average X * number of studies

More Related