flooding bi issues sig bi conference 29 october 2007 damian glynn ba hons fca fcila fuedi elae n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Flooding: BI Issues SIG BI Conference 29 October 2007 Damian Glynn BA(Hons) FCA FCILA FUEDI ELAE PowerPoint Presentation
Download Presentation
Flooding: BI Issues SIG BI Conference 29 October 2007 Damian Glynn BA(Hons) FCA FCILA FUEDI ELAE

Loading in 2 Seconds...

play fullscreen
1 / 9

Flooding: BI Issues SIG BI Conference 29 October 2007 Damian Glynn BA(Hons) FCA FCILA FUEDI ELAE - PowerPoint PPT Presentation


  • 351 Views
  • Uploaded on

Flooding: BI Issues SIG BI Conference 29 October 2007 Damian Glynn BA(Hons) FCA FCILA FUEDI ELAE. BI Flooding: Overview. Operative Peril Premises Quantum Denial of Access Loss of Attraction Insufficient water. BI Flooding: Operative Peril. Flood Storm Escape of water.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Flooding: BI Issues SIG BI Conference 29 October 2007 Damian Glynn BA(Hons) FCA FCILA FUEDI ELAE' - albin


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
flooding bi issues sig bi conference 29 october 2007 damian glynn ba hons fca fcila fuedi elae
Flooding: BI Issues

SIG BI Conference 29 October 2007

Damian Glynn BA(Hons) FCA FCILA FUEDI ELAE

bi flooding overview
BI Flooding: Overview
  • Operative Peril
  • Premises
  • Quantum
  • Denial of Access
  • Loss of Attraction
  • Insufficient water
bi flooding operative peril
BI Flooding: Operative Peril
  • Flood
  • Storm
  • Escape of water
bi flooding premises
BI Flooding: Premises
  • Shopping Centres
  • Multi tenanted office buildings
  • Vicinity
bi flooding quantum
BI Flooding: Quantum
  • BI losses flowing from Damage
  • Downturn due to general damage
  • Trend analysis
    • Soft furnishings
    • Pumping Equipment
  • Alternative trading/transfer of business
bi flooding denial of access
BI Flooding: Denial of Access
  • Physical hindrance/denial not disinclination
  • Denial to Insured’s Premises
  • Damage: Repair/Temporary Impairment
  • Definition of vicinity
  • Need for Property damaged to be Insured
  • Time limits/franchises
bi flooding loss of attraction
BI Flooding: Loss of Attraction
  • Meadowhall
  • Definition of Premises
  • Interface with Denial of Access/general area damage
bi flooding insufficient water
BI Flooding: Insufficient water
  • Terminal Ends failure/Generating station
  • Damage at Severn Trent Tewkesbury
  • Business closures due to lack of water
  • Trends – bigger slices/smaller cakes
bi flooding
BI Flooding
  • Feedback on SIG note
  • General comments