An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMS – Server Virtualization State of Illinois Central Management Services Server VirtualizationRandy AndersonServer Virtualization Manager

  2. CMS – Server Virtualization Reasons why CMS looked at a virtual server solution • Agency Consolidation to Primary Datacenter • Physical Space • Power • Hardware Refresh • High Availability

  3. CMS – Server Virtualization The New Physical Environment • Water Cooled Racks • Hardware • HP Blade Servers – • Dual AMD 2.6GHZ dual core • 16GB ram • SAN attached • EMC Symmetrix DMX • VMware ESX 3.5 • 16 blades per VM clusters • VM clusters spread across 4 racks and 4 enclosures

  4. CMS – Server Virtualization Virtualization Project – phase 1 • Server Assessment • 380 servers assessed • 4 servers were deemed as “not candidates” • Physical to Virtual process (P2V) • Planning is the most important step • Time for P2V to run is unknown • Documentation – the before and after settings

  5. CMS – Server Virtualization Virtualization Project – phase 1 • Issues we ran into • Fear, Uncertainty, and Doubt (FUD) - #1 Problem • Hidden legacy server problems • Conversion time – no way to predict • Digital Certificates had to be recreated • Application Licenses tied to MAC address

  6. CMS – Server Virtualization Virtualization Project – phase 1 • Current Numbers • Total number of physical servers removed – 280 • Total number of virtual servers – 471

  7. CMS – Server Virtualization Virtualization Project – phase 2 • Project will continue with the next set of servers • The remaining Windows servers will be assessed • Netware servers • Legacy virtual servers moved to new environment