Challenges<br>u25cf Failure due to misalignment<br>Critical equipment<br>u25cf Motor, Roller bearing, Gearbox<br>Impact of an unplanned shutdown<br>u25cf Restoration time - approx 48 hours<br>u25cf Financial loss (batch wastage) - (It can lead to plant<br>shutdown)<br>Key process parameters<br>u25cf TV<br>u25cf Tan Delta Number (Oil Quality)<br>u25cf Temperature<br>ARM Solution<br>u25cf Engineering schematic<br>u25cf Dashboard

Download Presentation

_2020-07-Metal Industries- Asset Reliability Used Cases

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Metal Industry Reference Cases

  2. #1 Caster Mill Drive: Challenges ● Failure due to misalignment Critical equipment ● Motor, Roller bearing, Gearbox Impact of an unplanned shutdown ● Restoration time - approx 48 hours ● Financial loss (batch wastage) - (It can lead to plant shutdown) Key process parameters ● TV ● Tan Delta Number (Oil Quality) ● Temperature ARM Solution ● ● Engineering schematic Dashboard

  3. Caster Mill Schematic

  4. Caster Mill - IoT Dashboard - Overview

  5. Drive Motor IoT Dashboard

  6. Recommendations and Alarms

  7. Gear Oil Condition

  8. #2 Blast Furnace Blower: Challenges ● Motor Failure due to high load / vibration Critical equipment ● Motor, Gearbox Impact of an unplanned shutdown ● Restoration time - ● Financial loss (batch wastage) - Key process parameters ● TV ARM Solution ● ● Engineering schematic Dashboard

  9. BF Blower - Schematic

  10. BF Blower - IoT Dashboard - Overview

  11. Blower Motor IoT Dashboard

  12. Recommendations and Alarms

  13. #3 Transformer Oil Condition: Challenges ● ● Oil Deterioration due to moisture and oxidation No advance warning to take corrective actions Critical equipment ● Transformer Impact of an unplanned shutdown ● Restoration time - ~8-10 Hours Key process parameters ● Tan Delta Number (Oil Quality) ● Temperature ARM Solution ● ● Engineering schematic Dashboard

  14. Transformer Oil Condition Monitoring - Schematic

  15. Transformer Oil Condition - IoT Dashboard

  16. #4 Hydraulic Power House: Challenges ● Oil Deterioration due to moisture and oxidation can create problem Hydraulic line in steel making process Critical equipment Main Lube Line (Oil Monitoring) ● Impact of an unplanned shutdown Restoration time - Financial loss (batch wastage) - ● ● Key process parameters Tan Delta Number (Oil Quality) Temperature ● ● ARM Solution ● ● Engineering schematic Dashboard

  17. Hydraulic Power Pack - IoT Dashboard Overview

  18. Hydraulic Oil Condition -IoT Dashboard