1 / 18

Economics for Constituents

Economics for Constituents. GRIDCO. DVC. WBSEB. SIKKIM. 1.80. Total PU. 1.75. 1.70. 1.65. 1.60. 1.55. 1.50. 1.45. BSEB. JSEB. DVC. GRIDCO. WBSEB. SIKKIM. ER. UI Behaviour. UI Rs/- & MWH. UI: 2740 MU Rs/- 511 Cr. PU Rate for UI. SUMMARY. IMPROVED FREQUENCY PROFILE.

aira
Download Presentation

Economics for Constituents

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Economics forConstituents

  2. GRIDCO

  3. DVC

  4. WBSEB

  5. SIKKIM

  6. 1.80 Total PU 1.75 1.70 1.65 1.60 1.55 1.50 1.45 BSEB JSEB DVC GRIDCO WBSEB SIKKIM ER

  7. UI Behaviour

  8. UI Rs/- & MWH UI: 2740 MU Rs/- 511 Cr

  9. PU Rate for UI

  10. SUMMARY • IMPROVED FREQUENCY PROFILE • CHEAPER PLANTS MOSTLY USED- MERIT ORDER • EFFECTIVEHYDRO UTILISATION • FRAMEWORK AND DATUM FOR TRADING: Inter-State Open Access in place • AUTONOMY TO STATES • UFR’s MADE EFFECTIVE –TO BE USED AS DEFENSE • ALLOCATIONS HAVE REAL MEANING • INTRA/INTER REGIONAL UI TRADING- OPPORTUNITY EXCHANGE • NO NEED FOR OPENING ELEMENTS AS REGULATORY MEASURE Competetive Power Market

  11. Thank you Visit us at www.erldc.com or mail at erldc@vsnl.com

More Related