An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NGAO Meeting #3Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006

  2. Welcome - Participants • Telecon Attendees: • NGAO Executive Committee: Rich Dekany, Don Gavel, Claire Max, Peter Wizinowich • Sean Adkins, Brian Bauman, Antonin Bouchez, Ralf Flicker, Erik Johansson, Mike Liu, Franck Marchis, David Le Mignant, Anna Moore(?), Chris Neyman, Viswa Velur

  3. Goals of Today’s Meeting • Review Progress (management, science, performance budget & instrument updates) • Review trade study reports

  4. Meeting Agenda (PST times)http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/061213_Remote_NGAO_Meeting_3 09:50 Welcome (& connections) 10:00 Management Report (Wizinowich) 10:25 Science Team Report (Max) 10:45 Systems Engineering Report (Dekany) 11:10 Trade Study Report: MOAO vs MCAO (Gavel) 11:40 TS Report: Rayleigh Rejection Strategies (Velur) 12:00 TS Report: Stand-alone vs DM on T/T (Bauman) 12:20 Break 12:40 Instrument Trade Studies Update (Adkins) 13:00 Upcoming tasks & milestones (Wizinowich) 13:20 Discussion: Issues pertaining to ongoing & upcoming work 14:30 Adjourn

  5. NGAO System Design PhaseManagement Report NGAO Meeting #3 Peter Wizinowich December 13, 2006

  6. Presentation Sequence • System Design (SD) Phase SEMP Approval Status • SD Phase Tracking • Meeting Tracking • Meeting action items status • EC meeting minutes • Work scope planning sheets status • Posted documents

  7. System Design Phase Approval Status • SEMP submitted to the Observatory Directors on 9/29/06 for approval • Official response not yet received (has been requested) • Major issue is how many $ can be made available in FY07 • Direction from WMKO management to proceed while decision is being made • Statements of work complete for COO & UCO & purchase requisitions about to be issued with limited initial funding

  8. System Design Phase Tracking • Tracked (Excel) version of the plan posted at http://www.oir.caltech.edu/twiki_oir/pub/Keck/NGAO/SystemDesignPhasePlanning/NGAO_SD_schedule_v20_tracked.xls • Excel version highlights what’s complete, what’s late, what’s due within next month & status of work scope planning sheets.

  9. Meeting Tracking • The tracked version of the action items from meeting 2 are posted at http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/061114_CIT_NGAO_Meeting_2 • The minutes & action items from the EC meetings are posted at http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/SystemDesignPhasePlanning

  10. Work Scope Planning & Approval • Simplified template posted at http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/NGAOTemplates • To be prepared by WBS element lead & approved prior to performing significant work on a WBS element • Approvals & document control by WBSx.x lead & Wizinowich • We will endeavor to provide approvals within 5 working days of submittal • List of all WBS elements requiring a scope planning sheet can be found at: http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/WorkProducts • Table also provides a location for posting the planning sheets & deliverables • Draft planning sheets posted for many items (includes WBS number, name, dictionary definition & effort estimate from SEMP) • Planning sheet status • Posted for WBS 2.2, 3.1.1.1.1 & 3.1.1.5 • Approved for WBS 3.1.2.1.1, 3.1.2.2.13 & 3.1.2.3.3. • REMINDER to fill out these planning sheets!

  11. Posted Documents • KAON 415 TMT site monitoring data (restricted access) • KAON 416 Atmospheric sodium density from Keck LGS photometry • KAON 417 Sodium abundance data from MAUI Mesosphere • KAON 427 Variable vs fixed LGS asterism • KAON 429 LGS asterism geometry & size • MOAO vs MCAO trade study report

  12. NGAO System Design PhaseUpcoming Tasks & Milestones NGAO Meeting #3 Peter Wizinowich December 13, 2006

  13. Upcoming Meetings & Milestones • Meeting #4 is Jan. 22 at Keck HQ • http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/070122_NGAO_Meeting_4 • Will need % complete for WBS elements prior to meeting (also to be used for SSC report) • SSC meeting Jan. 24 at Keck HQ • 1st project report to SSC & Observatory management • Will need a good estimate of project completion versus costs to date • Milestones: • SEMP approval was due 10/9 (verbal ok only) • SD phase contracts in place was due 10/27 • Science requirements summary v1.0 was due 10/27 • System requirements document v1.0 was due 12/8 We need to show all of these milestones as complete at SSC meeting!

  14. NGAO SD PhaseMilestones

  15. Team Meeting Calendar