An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How to move on: The Project (BP&BT) „Integration“ „Materials“ The PEOPLE „Confidence“

  2. Influence Points (IP): • IP-coordinates • Parameter for assigned to line IPs • Lines: • Tangents REFERENCE • Base-Profile: • Coordinates of the section nodes • Tangents of the segments • Locale Sections: • Sliding along a base line • Rotation • Translation • Scaling FE model; Courtesy of: How to move on: Integration Courtesy of SFE Topology based fully parametric modeling • PID: • Sheet thickness t

  3. How to move on: Confidence Robust/Reliability Design (Quality Engineering) Y2 Search for solution Optimization (Approximations) Constraint Boundary DOE: Critical Factors And Initial Design Feasible Infeasible (safe) (failed) X2 Initial Design Y1 X1

  4.  Number of parallel concepts  Design influences  Size of geometrical changes  Number of geometrical changes per time  Possibility of geometrical changes Possible benefit for geometrical changes to generate customer value  Influence of material data on system property regarding a specific customer request • SOP • Concept Phase • Series development How to Move on: Materials Possible benefit for accuracy of results on verfication basis Benefit of Detailed Material Laws vs. Development Stage (courtesy of P&Z)

  5. Consumption & CO2 reduction 2008 2009 Short-term project targets (SP) about 2 years 2010-2012 Medium-term project targets (MP) about 3-5 years 2013-2016 Long-term project targets (LP) about 6-9 years How to move on: ASC(S Short-, Medium- and Long-term Project Targets

  6. SFE CONCEPT Topology & Geometry How to move on: ASC(S Optimization of Parametrized Vehicle Concepts in the Early Design Phase with respect to Functional Requirements as well as to Cost Cost Constraint MDO including Design to Cost Performance Cost