1 / 11

Desktop Survey

A well-executed desk study draws from a wide array of information sources, including Information about soil composition, rock layers, groundwater flow, and potential contamination migration pathways can be obtained from geological surveys and databases. Click here more about Desktop Survey: https://adeptus.co.uk/phase-1-desk-study-report-contamination<br><br><br>

Download Presentation

Desktop Survey

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Desk Study Site Investigation: The First Step Toward Informed and Risk- Free Land Development Adeptus adeptus.co.uk

  2. What is a Desk Study Site Investigation? A desk study, often referred to as Phase 1 of a site investigation, is a non-intrusive, research-based assessment of a piece of land. It involves collecting and analyzing existing data and documentation to determine the potential environmental, geological, and historical risks associated with the site. adeptus.co.uk

  3. adeptus.co.uk

  4. Desktop Survey A well-executed desk study draws from a wide array of information sources, including: Information about soil composition, rock layers, groundwater flow, and potential contamination migration pathways can be obtained from geological surveys and databases. adeptus.co.uk

  5. Contamination Reports If If the the desktop desktop study geotechnical geotechnical issues, be be recommended recommended. . The The desktop desktop study plays plays a a regulatory regulatory compliance, compliance, and study suggests suggests possible issues, a a Phase Phase 2 2 intrusive possible contamination contamination or intrusive investigation investigation may or may study report critical critical report may role role in in and cost adeptus.co.uk may be proactive proactive cost- -effective effective project be a a preliminary preliminary step, risk risk project planning step, but management, management, planning. . but it it

  6. Desk Study Site Investigation Before Before a a shovel crucial crucial phase phase of of land the the scenes scenes— but but vital vital step step is is the mitigated mitigated development development project shovel hits hits the land development development takes the desk desk study study site the cornerstone cornerstone of of any project. . the ground ground or or a a foundation foundation is is poured, takes place place quietly site investigation investigation. . This any responsible responsible and poured, a a quietly behind This preliminary preliminary and risk behind —the risk- - adeptus.co.uk

  7. Environmental Consultant and Services In today’s increasingly regulated and environmentally conscious world, obtaining the necessary environmental permits for development and industrial projects is more than just a legal formality—it’s a critical step in project planning and execution. Environmental permitting consultants have emerged as indispensable allies for businesses and developers aiming to navigate the complex, often daunting world of environmental compliance. adeptus.co.uk

  8. Desktop Study Report A desktop study report—also known as a desk study or Phase 1 Environmental Assessment—is a assessment based solely on existing data sources. No soil testing, drilling, or physical intrusion is involved. preliminary site adeptus.co.uk

  9. Conclusion: Desk Studies as Smart Risk Management A desk study site investigation may not be the most glamorous part of development, but it is one of the most cost-effective, informative, and strategic. It lays the foundation for safe, sustainable, and compliant development by exposing hidden risks and informing better design and financial decisions. adeptus.co.uk

  10. GET IN TOUCH Adeptus Adeptus Location: 401 Faraday Street, Birchwood, Warrington WA3 6GA Location: 401 Faraday Street, Birchwood, Warrington WA3 6GA UK UK Email Email: : contact@adeptus.co.uk contact@adeptus.co.uk Phone: Phone: +44 (0)1925 599 +44 (0)1925 599 052 052 adeptus.co.uk

  11. THANK YOU! adeptus.co.uk

More Related