Interchange Distribution Calculator Working Group (IDCWG) Update

Interchange Distribution Calculator Working Group (IDCWG) Update. Yasser Bahbaz IDCWG Chair BPS Update September 13 th , 2011. IDCWG Update. IDC Change Order Updates GTL Update. Implemented. CO 313: Use of SDX Common Names in IDC CO-321: Data Interface for TLR CMR Report Data for SPP

adanne
Download Presentation

Interchange Distribution Calculator Working Group (IDCWG) Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Interchange Distribution Calculator Working Group(IDCWG)Update Yasser Bahbaz IDCWG Chair BPS Update September 13th, 2011

  2. IDCWG Update • IDC Change Order Updates • GTL Update

  3. Implemented • CO 313: Use of SDX Common Names in IDC • CO-321: Data Interface for TLR CMR Report Data for SPP • CO 324: Change in Default TLR Start Time for TLR 3B and 5B in IDC TLR Issuance Window • CO-325: Changes to TLR Event History Display • CO 327: Creation of TAP Pseudo BA in TVA. • SDX CO 07: SDX File Daily Load Time Conversion • BOF CO 10: Temp Flowgate Validation

  4. Development/Testing • CO 320: Set PGEN for Base Loaded Units to Effective Pmax for NNL *** Will be implemented on October 4th *** • CO 322: PFV Generation Priority Submissions • CO 328: Intra Hour Tag Curtailment • CO 329: Load Adjustments at the time of TLR 5 Issuance.

  5. DRAFT/Evaluation • CO 326: PFV Metrics • CO 330: Authorization of OATI Use of IDC Data for DOE Studies • CO 331: IDC Interface to NAESB WebRegistry

  6. Other Items • IDCWG and OATI will be drafting a CO 283 summary write Up. • A Request for Initiation of a NAESB BP Standard regarding TLR 5B re-allocation logic is drafted.

  7. IDCWG Update GTL Update

  8. IDCWG Update • GTL Calculation Testing – • Calculation Testing Sessions: • Test Plans Developed For GTL Calcs Prior To Test Sessions • Test sessions at OATI Offices on May 12th. • Group Is Expected To Have Finished most of the Calculation Testing during the October Meeting. • Results: • No Outstanding Variances • Functional Testing Completed • CO-283 Developed As Specified Pending Required Changes For The Recently Reached BPS PFV Permanent Solution.

  9. IDCWG Update GTL Data Submission

  10. IDCWG Update • GTL Data Submission – • Full Data Load Submission: • Data Is Submitted but NOT at full Rate yet. • Issues With Data Mapping and Data Validity Remain But Enhanced. • OATI Will Address Implementation Issues As They Arise

  11. IDCWG Update Change Order 283 Status

  12. IDCWG Update • Change Order 283 Status – • IDCWG Approved CO-283 As Implemented On November 1 2010 • GTL Logic Has Been Implemented onto Production IDC. • Most Entities Are Submitting Data to Development Site ONLY Due To System Limitations. • IDCWG discussed the coordination of submitting data to both Testing and Production environments.

  13. IDCWG Update • IDCWG • Resolved Data Confidentiality Issues Related To GTL Data During Last IDCWG Meeting In January. • Resolved The Generation Priority Submission Issue. • Calculation Testing Is In Progress By Entities. • PFV Metrics Change Order Has Been Revised Several Times By The Group. The draft will be presented to the ORS.

  14. IDCWG Update Questions?