Off-corridor Habitat Enhancement PMH1 IAERC November 25, 2009 . PMH1 Off-Corridor Habitat Enhancement:. Review and current status on PMH1 off-corridor habitat works Brae Slough – Implementation Mundy Creek – Implementation Wilson Farm – Concept .

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Off-corridor Habitat Enhancement PMH1 IAERC November 25, 2009' - abril


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Off-corridor Habitat Enhancement

PMH1 IAERC November 25, 2009

pmh1 off corridor habitat enhancement
PMH1 Off-Corridor Habitat Enhancement:
  • Review and current status on PMH1 off-corridor habitat works
    • Brae Slough – Implementation
    • Mundy Creek – Implementation
    • Wilson Farm – Concept
brae slough implementation straw placement
Brae Slough Implementation: Straw Placement

September 29, 2009: Covering exposed channel slopes with straw

brae slough implementation amphibian salvage
Brae Slough Implementation: Amphibian Salvage

October 2, 2009: Long toed salamander salvaged.

brae slough implementation glover pond placing root wad
Brae Slough Implementation: Glover Pond – Placing root wad

October 6, 2009 – Placing cottonwood LWD in Glover Road Pond

brae slough implementation in line pond
Brae Slough Implementation: In-line pond

October 8, 2009 - Completed in-line pond, with LWD complexing.

brae slough implementation planting
Brae Slough Implementation: Planting

November 3, 2009: Willow cuttings and planted stock along riparian bench

brae slough
Brae Slough:

November 3, 2009 – View of Brae slough enhancement from Glover Road

mundy creek implementation
Mundy Creek Implementation
  • Excavation complete for loop channel.
  • LWD placement on loop channel complete.
  • Riparian planting on north leg of channel loop (primarily hardhack and salmonberry) complete.
  • Excavation of the channel extension has been initiated but not complete pending approvalfrom the utilities and regulatory agencies.
  • Hydraulic connection anticipated for summer 2010.
mundy creek implementation1
Mundy Creek - Implementation

Excavation has been undertaken to ensure the channel and banks are roughly textured leaving a high proportion of overlying organic soil in place to provide an organic growing medium for plants.

mundy creek lwd placement
Mundy Creek – LWD Placement

Wood debris placement along north arm of channel looking west.

mundy creek implementation complexing
Mundy Creek Implementation: Complexing

Tree stem anchoring. Cable attached to eye cemented in to buried boulder

mundy creek implementation complexing1
Mundy Creek Implementation: Complexing

October 8, 2009: Preparing anchor boulders.

mundy creek implementation planting
Mundy Creek Implementation: Planting

North leg showing planting densities.

Planks placed to provide access across channel for planting crew.

mundy creek implementation planting1
Mundy Creek Implementation: Planting

North leg of channel looking west showing woody debris placement and riparian planting