Syngas Production from Petroleum Coke Gasification

Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept. Of Chemical Engineering April 5, 2011. Syngas Production from Petroleum Coke Gasification . Project Purpose . What we are doing?

abram
Download Presentation

Syngas Production from Petroleum Coke Gasification

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept. Of Chemical Engineering April 5, 2011 Syngas Production from Petroleum Coke Gasification

  2. Project Purpose • What we are doing? • Producing syngas from petcoke • Using entrained flow gasifier • Implementing a rigorous syngas cleaning • Why we are doing this? • Making syngas for acetic acid production • Chemical production team specs • CO to H2 molar ratio of 0.409 • CO2 and N2 mixed in http://coalgasificationnews.com/tag/petcoke-gasification/

  3. Overall Block Flow

  4. Recap • Discussed Our Aspen Simulation • Gasifier • Sulfur Removal • Water Gas Shift • CO2 Removal • Claus Process • Heat Loads • Optimization • Equipment Costs and Sizes • Individual Economics • Sensitivity Analysis • Location

  5. Agenda • PFD • Initial Control Scheme • Plant Layout (General Arrangement) • Calculations • Refined Economics

  6. PFD: Overall Process

  7. PFD: Gasification

  8. PFD: Hydrogen Sulfide Removal

  9. PFD: Water Gas Shift

  10. PFD: CO2 Absorption

  11. PFD: CO2 Sequestration

  12. PFD: Claus Process

  13. Control Scheme: H2S Removal

  14. Control Scheme: Water Gas Shift

  15. Plant Layout: Overall

  16. Plant Layout: Gasification Island

  17. Plant Layout: H2S Removal

  18. Calculations

  19. Refined Economics:Raw Material Cost

  20. Capital Cost Analysis

  21. Economics Summary

  22. Sensitivity Analysis

  23. Sensitivity Analysis

  24. Sensitivity Analysis

  25. Sensitivity Analysis

  26. Conclusion • PFD • Control Schemes • Plant Layout • Calculations • Refined Economics

  27. Next Steps • Revise report

  28. Questions?

  29. References • Richard Parkinson.  “Where Does It Go? An Introduction to the Placement of Process Equipment.”  UOPPowerPoint.  2009.2 April 2011.

  30. Report Outline • Final Report: • Executive Summary IP • Discussion IP • Recommendations IP • Appendices • Design Basis: Done • Block Flow Diagram: Done • Process Flow Showing Major Equip.: Done

  31. Report Outline • Appendices (Continued) • Material and Energy Balances: Done • Calculations: IP • Annotated Equip. List: Done • Econ. Eval. Factored from Equip. Costs: Done • Utilities: IP • Conceptual Control Scheme: Done • Major Equipment Layout: Done

  32. Report Outline • Appendices (Continued) • Distribution and End-use Issues: IP • Constraints Review: IP • Applicable Standards: IP • Project Communications File: IP • Information Sources and References: IP

  33. Control Scheme: CO2 Absorption

  34. Control Scheme: CO2 Sequestration

  35. Control Scheme: Gasifier

  36. Control Scheme: Claus Process

  37. Energy Balance Around WGS Reactor

  38. Energy BalanceAround WGS Reactor

  39. Heat Loads

  40. CO2 Sequestration • CO2 in our syngas is absorbed on Selexol to be selectively removed • Delete only one CO2 slide.

  41. http://fossil.energy.gov/images/programs/sequestration/what_sequestration_lg.jpghttp://fossil.energy.gov/images/programs/sequestration/what_sequestration_lg.jpg