An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Blasting Regulations Regulatory Requirements for Blasting Operations

  2. Legal Standards • 29 CFR Part 1910 - General Industry • 29 CFR Part 1926 - Construction • BATF • DOT

  3. General Provisions: • General requirements not specifically related to a particular operation or procedure • Usually broad in scope • “Do’s and Don’ts”, “Always and Nevers”

  4. Blaster Qualifications: • Knowledge and Experience • Training • Physical Ability • Evidence of Competency Certified Blaster

  5. Storage of Explosives: • Storage in Magazines • Separate Magazines for Explosives and Detonators • Separation Distances • barricaded • unbarricaded

  6. Transporting Explosives • Requires CDL with Hazmat Endorsement • Proper Placarding • No smoking, etc. • Same vehicle for explosives and detonators may be permitted • Route Plan

  7. Loading Explosives: • No operating equipment within 50 feet of loaded holes • Load only those holes intended to be fired in the next round • Warning signs posted • Check all holes for depth prior to loading

  8. Initiation of Explosives: • Connections from boreholes back to source of firing current • Survey for extraneous electricity • Solid Connecting & Lead wires • EB detonators all the same kind • Proper resistance • Leg wires shunted

  9. Initiation of Explosives - cont: • Only the Blastershall: • be in charge of the blasting machine • connect lead wires to machine • test circuits with Blasting Galvanometers • fire the shot • immediately disconnect lead wires after firing the shot

  10. Firing the Blast: • Code of signals, familiar to everyone, must be posted • Loud warning signal prior to firing the shot • Flagmen posted at every roadway passing through the blasting zone • Blaster must assure safety

  11. Post Blast Inspection: • Disconnect firing line immediately after blast • Allow sufficient time for dispersion of fumes • Blaster must verify all charges have fired before others are allowed into blast area

  12. Misfires: • Exclude all employees from danger zone • No other work except that required to clear the misfire • First attempt is to re-fire the hole • Explosives may be removed by washing out with water if re-fire doesn’t work • All non-electric misfires require 1 hr wait • Misfires handled by Blaster in charge

  13. Personal Protective Equipment: • Hard Hat • Safety Toed Shoes • Reflective Vest • Safety Glasses • Gloves • Hearing Protection

  14. Other Regulated Operations: • Underground Transportation - 1926.903 • Use of Safety Fuse - 1926.907 • Use of Detonating Cord - 1926.908 • Underwater Blasting - 1926.912 • Blasting in Excavation Work Under Compressed Air - 1926.913