PIP Update

PIP Update. Dec 5 th 2012. Agenda. Summary Update Current Activities Updates/Talks: CY Tan – RIL Status/Plans F. Garcia – Linac Status/Plans. Update. General Info Current Work Booster RF cavity rework – Two cavities waiting (1&3) – 3 is at MI-60

aaralyn
Download Presentation

PIP Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIP Update Dec 5th 2012

  2. Agenda • Summary Update • Current Activities Updates/Talks: • CY Tan – RIL Status/Plans • F. Garcia – Linac Status/Plans

  3. Update General Info • Current Work Booster RF cavity rework – Two cavities waiting (1&3) – 3 is at MI-60 Tuner Work – Completed a set of ~ 9 cones Starting Tuner work. Complete a tuner in a couple of next week – then start on RF3. LCW – L2-1 manifold leak – finished, Replacing L3, MP02 tubing – progressing, Replace strainer valves on magnet bus – complete, Repair L5 choke leak - continues, Replace reference magnet hosing – completeat L1-2 manifold, replace "Y" strainer valves leaking (7), re-hose reference magnet RFQ – Beam down to NTF/tuning – shutdown this week for work – Tan’s Talk HPowerNO word Booster Absorber: One steel block modified/alignment done/finish stacking Linac Modulator – EE continues testing (update talk sometime) Booster SS: 12 out of 19 stations have had the attenuation and phase measured for the BRF fanbacksystem, prepping for modulators Booster Modulator work – Did not ship last week – 4 this week, 2 next week,4CW800F filament transformers going and should be completed this week Cogging – Software work continues Booster Shielding – Safety meeting – went over penetration issues Shutdown - comments (Fernanda, Todd, Mary) End of Fiscal Year – Not much change –

  4. Mary: Scheduling meeting tomorrow In Huddle

  5. Upcoming • RLS – updates (last week ) Due back • (Elmie is gone but not forgotten – Ken is now the controls person) • Reports (upcoming) • December 12: • Jon Reid - Collected results from first four cavity refurbishments, new-ferrite tuner, potential stem interface modifications, and cavity 1013 • Todd Sullivan - Booster Startup Plans • To be scheduled: • Alex Macridin - Simulations of Transverse Instabilities • Dan Wolff et al. - Linac Modulator Prototyping • Dave Hixson - Booster LCW Upgrades Final Report • PIP Talks/Lab Meetings/Management • AEM - January • Quarterly Report - January • PIP PMG - January