Skipping MEP Clash Detection Can Cost You More Than You Think!

Overlooking MEP clash detection can result in poor performance and rising costs once construction is underway.<br><br>Tejjy Inc. uses intelligent BIM coordination to detect and resolve system conflicts in the design phase itself.<br><br>Minimize change orders<br>Maximize system efficiency<br>Protect project timelines<br>Ensure on-site safety<br><br>Let Tejjy Inc. help you build with confidence, not complications.<br><br>Visit to learn more: https://www.tejjy.com/our-services/mep-services/mep-coordination-services/

Sophia88
Download Presentation

Skipping MEP Clash Detection Can Cost You More Than You Think!

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Risk of Skipping MEP Clash Detection

  2. What is MEP Clash Detection? Clash detection identifies conflicts between Mechanical, Electrical, and Plumbing systems before construction begins. It ensures all elements work together seamlessly in a 3D BIM environment.

  3. Cost Overruns Unidentified clashes lead to rework on-site, which increases material wastage, labor costs, and project delays. Fixing a clash post-construction costs 5x more than during design.

  4. Project Delays On-site conflicts halt construction until issues are resolved. This disrupts schedules and affects project timelines.

  5. Safety Hazards Improperly placed systems can create safety risks—like blocked access to fire exits, overloaded electrical routes, or HVAC duct interference.

  6. Poor System Performance Without coordination, systems may not operate efficiently. Examples: HVAC ducts clashing with structural beams or plumbing lines intersecting with electrical conduits.

  7. The Smart Move – BIM Coordination With BIM clash detection, all MEP systems are checked in a virtual model. Conflicts are resolved before construction, ensuring faster execution, reduced cost, and safer buildings.

  8. Partner with Tejjy Inc. We specialize in BIM-based MEP Clash Detection & Coordination. www.tejjy.com | info@tejjy.com