Performance Based System  for Determining Post Closure Care PCC at Florida MSW Landfills  Southwest Landfill, Alachua Co Preloader

Performance Based System for Determining Post Closure Care PCC at Florida MSW Landfills Southwest Landfill, Alachua Co - PowerPoint PPT Presentation


  • 189 Views
  • Uploaded on

Outline. Performance based methodologyTimeline Project statusGroundwater ModuleGroundwater monitoring well locationsStatistical comparisonGroundwater data analysis: VOCMetal analysis and resultsSummary Next. Performance Based Methodology. Developed by EREF (Geosyntec contractor)Comprised of four modules:Leachate Module Groundwater ModuleLandfill Gas Module Cap Module .

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Performance Based System for Determining Post Closure Care PCC at Florida MSW Landfills Southwest Landfill, Alachua Co' - Sophia


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript