HSE consideration during Lufeng 22-1 oil field decommissioning preparation Preloader

HSE consideration during Lufeng 22-1 oil field decommissioning preparation - PowerPoint PPT Presentation


  • 291 Views
  • Uploaded on

2. Lufeng 22-1 oil field with water depth of 330 meters, was discovered in May 1986, engineering and construction started in May 1996, and first oil was achieved on 27 December 1997. It produced more than 10 years now, much more longer than initially planned, i.e. 3 years.Due to challenging sea condition and complicated reservoir, many advanced technologies were used to develop the Lufeng 22-1 marginal oil field, and FPSO is leased in order to reduce the CAPEX..

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'HSE consideration during Lufeng 22-1 oil field decommissioning preparation' - Sophia


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript