0 likes | 5 Views
Solar PV Offering complete solar consultancy services for a bankable solar PV project SgurrEnergyu2019s solar engineering focused experience over the last decade makes it stand apart, with an impressive project portfolio and having worked for some of the most notable names in the industry has enabled us forge a trust of being a dependable engineering
E N D
Solar PV - SgurrEnergy sgurrenergy.com/solar-pv January 18, 2022 SgurrEnergy’s solar engineering focused experience over the last decade makes it stand apart, with an impressive project portfolio and having worked for some of the most notable names in the industry has enabled us forge a trust of being a dependable engineering consultant. We have also collaborated on special assignments with the most pre-eminent bank for writing a guide book for developers and investors, on utility scale power plants, besides being a dependable Lender’s Independent Engineer. 1/5
We offer 360° project life-cycle services for Solar PV plants, having delivered consulting and engineering services for more than 81+ GW globally till date. For nearly two decades and over 81+GW, providing sustainable solutions for the most challenging topographies Solar PV Solar PV installation has witnessed a sharp rise in the past few years than ever before, nations that have favorable conditions to bank on solar energy have set an ambitious vision for the next 2 decades vis-à-vis to installation of Solar PV plants. Cost of solar PV technologies have seen a steady decline in the recent past thereby decreasing the capital and associated costs, making it the most preferred source of renewable energy. With solar PV offering energy generation at the lowest price, being second to none, there is not just a monetary incentive but also the promise for a carbon free power generation. What truly positions SgurrEnergy as a distinguished consultant is that we have been focused only on providing consulting services for Solar PV power plants over the past decade. We offer 360° project life-cycle services for Solar PV plants, having delivered consulting and engineering services for more than 61GW till date, has empowered us with a diverse experience and a comprehensive understanding, encompassing all the challenges that the developers and investors can encounter from conceptualization to commissioning of the power plant. Utility Scale Ground Mount Solar PV installations have gone up in scale and capacity of deployment to become a mainstream power producer over the last decade. Being an intermittent power producer in nature it brings along its own set of challenges. SgurrEnergy has successfully delivered several utility scale ground mount projects since its inception in various geographies, and has been a preferred engineering consultant in most cases. Also, SgurrEnergy has been a proud and significant collaborator in the making of a detailed and comprehensive guidebook of utility scale power plants for Developers and Investors, published by the International Finance Corporation. Rooftop 2/5
Rooftop installations have garnered great popularity, formerly popular for domestic installations have now entered into the industrial arena. SgurrEnergy has an excellent understanding and experience of various rooftop installation use-cases to provide scenario specific solutions for clients. Rooftops installations unlike the ground mounted installation have a different set of challenges. At SgurrEnergy, we have capabilities that are able to deliver rooftop solutions from conceptualization of the structure to providing reinforcement solutions on the existing structure. A multidisciplinary team that brings along a vast experience and excellent technical acumen, formulating the most optimum solutions for the best cost- benefit ratio. Carport Adoption of Solar PV modules is also gaining momentum for solar car parks, and with the world moving towards Electric Vehicles (EVs), car ports become an ideal location for charging of EVs. SgurrEnergy with its extensive knowhow can support application based engineering for solar car ports. Solar Parks With countries looking for energy transition and reducing energy costs, large solar PV parks supplying power at extra high voltages becomes an ideal alternative; this essentially supports achieving large scale reductions in greenhouse gas emissions. Given the GW scale projects in nature, solar park requires huge infrastructure and facilities; SgurrEnergy has substantial experience working on solar park projects for some of the most notable names in the industry, our work portfolio is corroborative to our expertise and experience. With our in-house multi-disciplinary design and engineering teams we have considerable experience in providing ground investigations, infrastructure planning and power evacuation systems for solar parks. Our Proficiency – Your Benefits 3/5
One stop solution with 360° project life-cycle services commencing from as early as feasibility studies to right through development, implementation and operations. In-house multi-disciplinary teams for enhanced engineering and design. Iterative approach in design, simulation and modelling to reduce CAPEX and long term project sustainability. LCOE based approach for selecting key components forming a PV plant. End to end project expertise to eliminate project mismanagement and operational resiliency. Extensive experience working as an independent engineer for reputed investors, lenders and financial institutions. Deliver projects with best engineering practices, adherence to the latest industry standards, on schedule and in-budget. 4/5
Have been long setting benchmarks in the Solar PV industry. 5/5