0 likes | 2 Views
Lab Expo Engler Viscometer ensures precise viscosity testing of petroleum and bituminous products. Designed for reliability, it features dual-sample capability, a temperature range of 0u2013100u00b0C, stainless steel construction for durability, and efficient heating performance, making it ideal for lab applications.
E N D
Engler Viscometer 52-EVM200 52-EVM200 Engler Viscometer guarantees compliance with ASTM D1665 “Test Methods for Engler Viscosity of Petroleum Products” for determining kinetic viscosities of tars and their fluid products from ambient temperature to 100ºC (212ºF). It is designed and made as per “Asphalt Engler Viscosity Test (Engler Viscometer Methods)”. Features: Stainless steel Inner container Simultaneous determination of two samples High Temperature control Accuracy Applications: It is extensively used for pharmaceutics, petroleum, chemical, scientific research etc.
Specifications : Graduated Flask 200 ± 0.2 ml (50 ± 0.2 ml for bituminous materials) Standard Water Value 51 ± 1 s Temperature Range 0 ~ 100 °C Ambient Temperature 10 °C ~ 40 °C Temperature Controlling Accuracy ± 0.1 °C Relative Humidity ? 85 % Timer Max is 9999 s Heating Power 700 W Dimension 630 x 490 x 760 mm Total Power Consumption ? 800 W Power Supply AC 220 V ± 10 %, 50 Hz Lab Expo 200 Continental Drive Newark, Delaware 19713 USA Email: info@labexpo.com | Website: Lab Expo | Phone: +1 302 665 0939