0 likes | 3 Views
Lab Expo Engler Viscometer delivers precise petroleum viscosity measurement with advanced features like a digital temperature controller and PID system for accuracy. Its stainless steel chambers resist corrosion, ensuring durability. It offers efficient operation with precise temperature and timing controls for reliable results.
E N D
Engler Viscometer 52-EVM100 52-EVM100 is designed according to the ASTM D1665 “Test Methods for Engler Viscosity of Petroleum Products” standard. It is devised with digital temperature controller and its chambers are made with stainless steel to avoid corrosion. Features: PID adjustment High accuracy Digital temperature controller Preset parameters with high temperature controlling accuracy Applications: It is extensively used for pharmaceutics, petroleum, chemical, scientific research etc.
Specifications : Graduated Flask 200 ± 0.2 ml Standard Water Value 51 ± 1 s Temperature Range 0 ~ 100 °C Temperature Controlling Accuracy ± 0.2 °C Accuracy Of Timer 0.01 s Dimension 510 x 360 x 270 mm Power Of Heater 550 W / 220 V Lab Expo 200 Continental Drive Newark, Delaware 19713 USA Email: info@labexpo.com | Website: Lab Expo | Phone: +1 302 665 0939