E N D
1. envir2800.ppt 1
2. envir2800.ppt 2 What We Work With Asbestos
Lead-based Paint & Leaded fixed items
Hazardous Building Materials
Indoor Air Quality; Mold, VOCs
Demo, Decon, LEED-Sustainability * SWOT Process - Saia
* Perspectives - Saia, Rogers, McBrayer, Hill, Downing, and Mette
* Workgroups
- Strengths - PM, PD, CT, SB, (LTC Bender)
- Weaknesses - EN, OV, IM, PA, EE
- Opportunities - CD, RM, OC, SO, DS
- Threats - RE, OP, IR, LM, SL
* Direction and Actions - All* SWOT Process - Saia
* Perspectives - Saia, Rogers, McBrayer, Hill, Downing, and Mette
* Workgroups
- Strengths - PM, PD, CT, SB, (LTC Bender)
- Weaknesses - EN, OV, IM, PA, EE
- Opportunities - CD, RM, OC, SO, DS
- Threats - RE, OP, IR, LM, SL
* Direction and Actions - All
3. envir2800.ppt 3 What We Work With Hazardous Waste Lamps (HWLs), Flourescent tubes, sodium halide &mercury vapor lights (HILs)
Mercury-containing items; Thermostats, Switched, etc.
PCB containing items; Transformers & light ballasts
Biologicals; (guano, mold, bacteria, fixed medical equipment)
Batteries & Radiological Detection & Computer Devices
smoke/fire alarm systems
computer components * SWOT Process - Saia
* Perspectives - Saia, Rogers, McBrayer, Hill, Downing, and Mette
* Workgroups
- Strengths - PM, PD, CT, SB, (LTC Bender)
- Weaknesses - EN, OV, IM, PA, EE
- Opportunities - CD, RM, OC, SO, DS
- Threats - RE, OP, IR, LM, SL
* Direction and Actions - All* SWOT Process - Saia
* Perspectives - Saia, Rogers, McBrayer, Hill, Downing, and Mette
* Workgroups
- Strengths - PM, PD, CT, SB, (LTC Bender)
- Weaknesses - EN, OV, IM, PA, EE
- Opportunities - CD, RM, OC, SO, DS
- Threats - RE, OP, IR, LM, SL
* Direction and Actions - All
4. envir2800.ppt 4 Regulations & Requirements School vs. Public Bldg. Vs. Everything Else
Renovation vs. Demolition vs. Deconstruction
Friable vs. Non-friable vs. Containerized
Avoidance vs. Total Removal * SWOT Process - Saia
* Perspectives - Saia, Rogers, McBrayer, Hill, Downing, and Mette
* Workgroups
- Strengths - PM, PD, CT, SB, (LTC Bender)
- Weaknesses - EN, OV, IM, PA, EE
- Opportunities - CD, RM, OC, SO, DS
- Threats - RE, OP, IR, LM, SL
* Direction and Actions - All* SWOT Process - Saia
* Perspectives - Saia, Rogers, McBrayer, Hill, Downing, and Mette
* Workgroups
- Strengths - PM, PD, CT, SB, (LTC Bender)
- Weaknesses - EN, OV, IM, PA, EE
- Opportunities - CD, RM, OC, SO, DS
- Threats - RE, OP, IR, LM, SL
* Direction and Actions - All
5. envir2800.ppt 5 What has Changed? Over 95% of DOD Construction is Design-Build
98% of the Request for Proposals (RFPs) are prepared by AE firms
Model RFP allows In-house USACE to address site development and environmental requirements
RFPs require the installations to provide “clean sites”.
Issues of building hazardous materials are not addressed by any USACE Standardization guidance
6. envir2800.ppt 6 EPA (Region 4)
OSHA (Fed OSHA vs. State OSHA)
DOT
State (EPD & DNR)
County/Regional (FL, GA, SC, NC)
Standard of Care liability
DOD (Army, Navy, Air Force) Regulations & Requirements * Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.* Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.
7. envir2800.ppt 7 Dept. of Army
USACE (UFGS) Specifications
Master Format- 4 to 5 number sets
Savannah District Design Manual
Installation Requirements Regulations & Requirements * Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.* Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.
8. envir2800.ppt 8 Target housing vs. Non-Target housing
Abatement vs. Renovation or Demolition
End-user Safety vs. Worker Safety vs. Environment
Disposal: Hazardous vs. Universal Waste
Recycle/Recovery vs. TSD of Waste Regulations & Requirements * Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.* Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.
9. envir2800.ppt 9 No Single source for Regulations
EPA Regional Regulations
Many entities are using risk-based assessments which do not work well with building components Regulations & Requirements * Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.* Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.
10. envir2800.ppt 10 EPA(RCRA, TSCA, Clean Water Act, Clean Air Act)
OSHA
State
DA, DOD, USACE
Very Limited Guidance due to Design-Build directives
Specific Instructions to RFP –design AE
Review of Award Contractor’s submittals to referenced regulatory stds and specific instructions Regulations & Requirements * Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.* Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.
11. envir2800.ppt 11 Challenges * Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.* Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.
12. envir2800.ppt 12 Challenges Project Name & Line Item Number
Installation Name & ACM/LBP POCs
USACE Business Office Contact
Purpose of Survey
Installation operational surveys are not sufficient for renovation & demolition..why?
Building Information ( Type , Sq.Ft, No. of Floors)
Type of Project * Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.* Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.
13. envir2800.ppt 13 Real Life
14. envir2800.ppt 14 Real Life .
15. envir2800.ppt 15 Real Life .
16. envir2800.ppt 16 Real Life
17. envir2800.ppt 17 Challenges (Cont.) Provide Copies of Previous Surveys
Has knowledge of Previous Renovations*
Knows Specific Building History & Building Use* * Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.* Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.
18. envir2800.ppt 18 Challenges (Cont.) Purpose of Survey:
Renovation. Renovated areas must be known before the field survey. It avoids high cost of unnecessary sampling and re-visits to sample untested areas
Abatement. Abating damaged materials while building is occupied is expensive.
Demolition. Some non-friable materials may be left in the debris thus reducing costs. HOWEVER, extreme care must be taken that the Contractor knows the Asbestos is there and that he can handle the material so it will not become a health hazard. * Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.* Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.
19. envir2800.ppt 19 Challenges (Cont.) All HBM must be removed prior to Bldg release to be deconstructed. This requires a survey.
Date of Construction doesn’t guarantee that some HBM were not used.
Building/Site Use BRAC
Converting hangar to office space?
Leed “live close to where you work”)
Type Structure (wood, cement block, etc.)
Recycler Removal nightmares * Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.* Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.
20. envir2800.ppt 20 Challenges (Cont.) Volunteers vs Contractors vs Free Lance Scavengers
Windows ( LBP, Asbestos Caulk & Glazing)
Fire doors, Elevator doors (Asbestos, Lead)
Brass
Water drainage
Smashed porcelain debris
Stainless Steel /Copper
Wall integrity
Hospital piping: bacteria, water drainage
electrocutions * Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.* Forecasting is not reliable for entrepreneurs shape the outcome of the future. “Entrepreneurs are risk takers.”
It is not what we should do tomorrow but rather what we need to do today to be ready for the uncertain tomorrow .
It deals with the futurity of present decisions.
* Plan to have the capacity to take risks and improve entrepreneurial performance.
21. envir2800.ppt 21 Challenges (Cont.) Recycler Removal Nightmares
Mold
Water from pipe drainage
Water from window openings
Mold growth/rot on wood makes it less valuable for recycle, good for chipping only
During renovations may need to decon mold on remaining wood
22. envir2800.ppt 22 New Construction Design-Build leaves room for Contractor error.
Drywall & wood left in moist air storage = mold
Painters turned up AC causing condensation overflow in pans = rust and mold
Design did not include pre-warming of AC-cooled air causing excessive condensation, rust, mold & staining
Improperly set & sealed windows
Negative vs Positive Pressure Bldgs
Wood yard mold... Not considered a ‘problem’ by Contractors (Yikes!)
Addressing moisture removal from shower areas
23. envir2800.ppt 23 Questions???? ????
!!!!!!
? ? ? ? ?