Rewiresecurity
Uploaded by
13 SLIDES
146 VIEWS
130LIKES

Connected 4G Dashcam

DESCRIPTION

Gain complete visibility of your vehicles and drivers with GPS-based location tracking coupled with Dual facing cameras, recording footage from the road the car is facing and footage from the driver behind the wheel. 4G Dashcamu2019s internal connectivity feature eliminates the need for the managers to retrieve memory disks from vehicles manually or to retrieve footage from a DVR. The 4G Dashcam automatically uploads critical videos to the cloud and allows retrieving custom footage from a custom date and time for up to 10 days. You will be able to access to footage using GPSLive web or mobile app.

1 / 13

Download Presentation

Connected 4G Dashcam

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Connected 4G Dashcam

  2. Real-time Location Tracking Alongside HD Video Footage Gain complete visibility of your vehicles and drivers with GPS-based location tracking coupled with Dual facing cameras, recording footage from the road the car is facing and footage from the driver behind the wheel. 4G Dashcam’s internal connectivity feature eliminates the need for the managers to retrieve memory disks from vehicles manually or to retrieve footage from a DVR. The 4G Dashcam automatically uploads critical videos to the cloud and allows retrieving custom footage from a custom date and time for up to 10 days. You will be able to access to footage using GPSLive web or mobile app.

  3. .

  4. Instant Alerts & Notifications 24/7, Anywhere in the World Using the camera’s built-in g-sensor, GPSLive instantly notifies you if it detects: harsh acceleration & harsh braking or if an accident occurs. 4G dashcam allows you to educate your drivers about good driving habits and get help to their location quickly in case of an accident. GPSLive can be accessed from anywhere in the world using a PC or a Laptop, and we offer the GPSLive mobile app for IOS and Android smartphones. Instant notifications can be set to be delivered by an SMS, email, or smartphone push notification.

  5. .

  6. Record HD Video Footage Of Important Incidents 4G Dashcam automatically records and uploads smooth, high-quality videos in case; Impact detection and unsafe driving events, such as harsh braking, accelerating, and cornering, allowing you to get notified of the event instantly. The recorded footage is available from both directions, facing the road and the driver simultaneously, and in 720p HD quality. Fleet managers can clearly understand what happened, where, when, and how. Connected dashcam auto-uploads impact detection and Panic button videos to the cloud.

  7. .

  8. Impact & Incident Detection Harsh Driving Detection 4G Dashcam features AI and intelligent algorithms for the crash and harsh event detection features. Using the built-in AI, g-sensor, and accelerometer, the camera is available to detect what’s happening throughout the journey, eliminating the need for a fleet manager to keep an eye on vehicles at all times. Incident videos are automatically uploaded to the cloud, allowing the managers to view them whenever they have time for it, using a PC, tablet, or smartphone.

  9. .

  10. Protect Your Vehicles & Educate Your Drivers 4G dashcam is ideal for recording video evidence of dangerous driving behaviour, including texting while driving or bad driving habits such as speeding. Fleet managers can proactively educate drivers about risky practices. Drivers who are accelerating too fast, engaged in risky driving, or not wearing seat belts can be educated by managers with better driving habits. 4G dashcam reduces accident risk and vehicle maintenance costs while improving driver safety.

  11. .

  12. Access Footage on Demand From PC & Smartphones 4G dashcam records impact videos automatically and features Live Stream, as well as requesting footage from the past up to ten days. You can submit a request to download video footage for a specific time range available on the SD card inside the camera; within minutes, you will receive the video to view it. You will easily access any video stored on the memory card via GPSLive web or GPSlive mobile app, 24/7.

  13. .

More Related