Senior Design: Team Bur...
Download
1 / 4

Preliminary Design Review 1: Project Plan - PowerPoint PPT Presentation


  • 389 Views
  • Updated On :
loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Preliminary Design Review 1: Project Plan' - Renfred


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Slide1 l.jpg

Senior Design: Team Burja_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Preliminary Design Review 1: Project Plan

AME 470: Senior Design

ASME Bulk Material Transporter

Matt Bertke, Paul DeMott, Patrick Hertzke, Will Sirokman

26 August 2004


Slide2 l.jpg

Senior Design: Team Burja_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Team Structure

Team roles and responsibilities

Team Leader Paul DeMott

Chief Engineer Will Sirokman

CAD/CAM and Fabrication EngineerPatrick Hertzke

Electrical and Controls Engineer Matt Bertke


Slide3 l.jpg

Senior Design: Team Burja_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

PRD Schedule

Tentative Schedule of Preliminary Design Reviews

26-Aug Team Organization

21-Aug Design Requirements, Specifications and Constraints

7-SepIndividual Concepts

14-SepTeam Concept

21-SepMobility

28-SepGrain Transportation and Delivery

5-OctControls and Electronics

12-Oct CAD/CAM

26-OctList of all parts and their sources; estimate of production costs.

2-NovOutstanding Issues

9-NovNone Scheduled

16-NovNone Scheduled


Slide4 l.jpg

Senior Design: Team Burja_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Gannt Chart

Graphical display of project scheduling