An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. NTC 320 All Assignments (New Syllabus) For more classes visit www.snaptutorial.com NTC 320 Week 1 West Consulting Customer Design Summary NTC 320 Week 2 West Consulting Modular Design Proposal NTC 320 Week 3 West Consulting IP Addressing Schema NTC 320 Week 4 West Consulting Data Center Design NTC 320 Week 5 West Consulting Voice And Video Network Design And Final Proposal NTC 320 Week 1 NTC 320 Week 2 Enterprise Data Center Design NTC 320 Week 2 Team Project Plan NTC 320 Week 3 Branch Office WAN Design NTC 320 Week 3 Team Progress Report NTC 320 Week 4 Route Redistribution Planning NTC 320 Week 4 Team Progress Report NTC 320 Week 5 Comprehensive Network Design NTC 320 Week 5 Wireless Design Project (word file only) ***********************************************

  2. NTC 320 Week 1 West Consulting Customer Design Summary For more classes visit www.snaptutorial.com Week 1 You work as a network consultant for West Consulting, a graphic design and printing company. West Consulting is growing in customer and sales volume and therefore, is expanding its local campus in Houston, Texas and adding a test location in China. You are tasked with designing a network to support their growth and expansion plan and drafting a proposal. You will work on this project over the next five weeks. The first task is to confirm your understanding of the project and outline your high-level plan to approach the design. Refer to the West Consulting Network Design Summary document; which lists the network requirements and configuration details. Create a Customer Design Summary that includes the following: • Project Summary • A description of the organization, the business environment, and the project purpose • Design Requirements

  3. • Desired functional network requirements, any technical constraints, and network performance or design goals • Existing High-Level Network Infrastructure Survey • Include logical topology diagrams (layer 3) and physical network diagrams of current infrastructure and routing • Implementation Plan • Description of a high-level network upgrade plan based on Cisco's network design lifecycle principles and an explanation of how your plan addresses West Consulting's goals and strategies Diagram your current network survey in Microsoft® Visio®. Document the remainder of your Customer Design Summary as either a: • A 2- to 3-page Microsoft® Word document • A 10-slide Microsoft® PowerPoint® presentation with detailed speaker notes Note: You will complete assignments related to this project throughout this course. The assignments build on one another. Therefore, it is recommended that you select the delivery method of a Microsoft®PowerPoint® presentation or a Microsoft® Word document you will want to use throughout these assignments. Also, You will use this completed assignment in the Week Two Individual Assignment titled, "West Consulting Modular Design Proposal." Submit your documents to the Assignments Files tab. NTC 320 Week 1 For more classes visit

  4. www.snaptutorial.com NTC 320 Week 1 Individual: High Level Network Diagram Option #1: Home Network Diagram (includes Microsoft Visio Diagram & PDF version) Option #2: Home Network Diagram (includes Microsoft Visio Diagram & PDF version) Assignment Preparation: Activities include completing the TestOut courses, independent student reading, and research. Complete the following sections of the TestOut Network Pro course Chapter 1, Networking Basics (includes videos, charts, labs, and practice questions): • 1.1, Networking Overview • 1.2, Network Topologies • 1.3, The OSI Model • 1.4, Network Signaling • 1.5, Network Protocols • 1.6, Numbering Systems Using Microsoft Visio, diagram the high-level topology of your network (office or home). If you do not have a network, diagram the network you would recommend. Submit your assignment using the Assignment Files tab. ***********************************************

  5. NTC 320 Week 2 Enterprise Data Center Design For more classes visit www.snaptutorial.com NTC 320 Week 2 Individual: Enterprise Data Center Design Includes Microsoft Visio file - Make your own edits to Diagram! Assignment Preparation: Activities include completing the TestOut course, independent student reading, and research. Complete the following sections of the TestOut Routing and Switching Pro course Chapter 2, Networking Concepts (includes videos, charts, labs, and practice questions): • 2.1, Networking Fundamentals • 2.2, Network Devices • 2.3, TCP/IP Networking Model • 2.4, Data Emcapsulation • 2.5, OSI Networking Model • 2.6, Data Communications • 2.7, Ethernet Networking • 2.8, WAN Fundamentals

  6. Using Visio, create a high level large enterprise data center design that follows the Cisco multilayer infrastructure architecture. Use Insert/Comment or Insert/Text Box to provide a brief explanation of each component. Submit your assignment using the Assignment Files tab. *********************************************** NTC 320 Week 2 Team Project Plan For more classes visit www.snaptutorial.com Learning Team: Project Plan Option#1: Project Plan - Word Doc Option#2: Project Plan - Excel Spreadsheet Review the Learning Team assignment, due in Week Five. Develop a project plan that details all tasks that must be completed to successfully submit the final learning team assignment. Each task must be accompanied by a start date, end date, and owner/resource assigned (the learning team member name). This will serve as your working project plan for the Learning Team project.

  7. The project plan should include all the tasks needed to complete each of the weekly deliverables: • logical network design - due Week Three • physical network design - due Week Four • comprehensive network design - due Week Five • final paper covering design criteria, assumptions, security plan, and rationale for decisions - due Week Five. The project plan can be created using Microsoft Excel or Microsoft Word (using a table). The project plan should include the following columns, with details in each column: Task ID, Task Description, Start Date, End Date, Dependencies/Predecessors (if applicable), Owner(s)/Resourc, and Percent Complete. You will need to update this project plan weekly. Submit your assignment using the Assignment Files tab. *********************************************** NTC 320 Week 2 Team Reding Health Group High-Level Design For more classes visit www.snaptutorial.com

  8. NTC 320 Week 2 Learning Team: Reding Health Group High- Level Design Resource:  Reding Health Group Enterprise Network Project Overview Review the Reding Health Group Enterprise Network Project Overview document to learn the network requirements. As a team, create a high-level design diagram for Reding Health Group that includes the following:  Annotations marking customer requirements  Planned design roadmap that includes proposed methodology, phases, and technologies  High-level technical design Create your diagram in Microsoft® Visio®. Document customer requirements and other information in a Microsoft® Word document if the Visio® annotations become too crowded. Note: You will use this assignment in subsequent Learning Team assignments. Submit your assignment to the Assignment Files tab. *********************************************** NTC 320 Week 2 West Consulting Modular Design Proposal

  9. For more classes visit www.snaptutorial.com Week 2: Individual To continue the network design to support the growth and expansion plan of West Consulting this week, you will create a modular design diagram and proposal summary. Reference the West Consulting Network Design Summary document and your completed Week One Individual Assignment titled, "West Consulting Customer Design Summary" when completing this task. Create a Modular Design Proposal that includes the following: • A diagram of your proposed hierarchical enterprise network that illustrates the relationships between the access, distribution, and core layers using the implementation plan created in your Week One Individual Assignment titled, "West Consulting Customer Design Summary." • A summary that details the following: • The Cisco® design principles and approach you will use to support this project and its diverse requirements • The steps the you will take to ensure the project plan and network design address West Consulting's long-term strategic plans and goals • Areas of specific concern related to the nature of the graphics data (traffic types, bandwidth, etc.) and relevant industry best practices you will follow to incorporate in addressing these potential concerns • A summary of how your design meets modularity, resiliency, and scalability for future growth Diagram your enterprise network design in Microsoft® Visio®. Document the remainder of your Design Proposal as either a:

  10. • A 2-page Microsoft® Word document • An 8-slide Microsoft® PowerPoint® presentation with detailed speaker notes Note: You will use this completed assignment in the Week Three Individual Assignment titled, "West Consulting IP Addressing Schema." *********************************************** NTC 320 Week 3 Branch Office WAN Design For more classes visit www.snaptutorial.com NTC 320 Week 3 Individual: Branch Office WAN Design Assignment Preparation: Activities include completing the TestOut course, independent student reading, and research. Complete the following sections of theTestOutNetworkPro course: Chapter 11, Wide Area Networks (WANs) (includes videos, charts, labs, and practice questions):

  11. • 11.4, Remote Access Chapter 10, Wireless Networking (includes videos, charts, labs, and practice questions): • 10.6.3, Wireless Attacks Using Microsoft Visio, design a branch office WAN solution that supports remote workers and exhibits redundancy. Use Insert/Comment or Insert/Text Box to provide a brief explanation of each component. Submit your assignment using the Assignment Files tab. *********************************************** NTC 320 Week 3 Team Progress Report For more classes visit www.snaptutorial.com Learning Team: Week Three Progress Report Review the Learning Team assignment, due in Week Five. Draft a logical diagram in Visio. Include the IP address schema. Unlike a physical diagram, this diagram should show routing information, traffic flows, and the subnets. Additionally, you should consider the network segmentation. Make sure to include the wireless

  12. network and how it is integrated into the wired network. This diagram will be included in the final Week Five deliverables. Update your project plan with percent complete. Submit your assignment using the Assignment Files tab. NTC 320 Week 3 Team Reding Health Group LAN, WAN, and Edge Network Designs For more classes visit www.snaptutorial.com NTC 320 Week 3 Learning Team: Reding Health Group LAN, WAN, and Edge Network Designs Resource:  Reding Health Group Enterprise Network Project Overview As a team, create detailed design LAN, WAN, and Edge Network diagrams in Microsoft®Visio®. Refer to the high-level design you created in the Week One Learning Team assignment titled, “Reding Health Group High Level Design.” Include annotations identifying how and where the designs meet customer requirements. Submit the Microsoft® Visio® files to the Assignment Files tab.

  13. *********************************************** NTC 320 Week 3 West Consulting IP Addressing Schema For more classes visit www.snaptutorial.com Week 3 To support the growth expansion plan and proposal of West Consulting, this week you will create the IP Addressing Schema. Refer to the West Consulting Network Design Summary document and previous individual assignments to complete this week's assignment. Create recommendations for both IPv4 and IPv6 schemas at the China location. Include the following: • An IPv4 table that includes the Classless Inter-Domain Routing (CIDR) notation, subnets, and number of hosts used at each site/subnet • An IPv6 scheme to integrate the two sites • Selected IP routing protocol(s) and your rationale for either maintaining or changing West Consulting's current protocol

  14. • Summary of how your routing protocol recommendations address network convergence and maximize performance Document your recommendation as either of the following: • A 1- to 2-page Microsoft® Word document • A 6- to 8-slide Microsoft® PowerPoint® presentation with detailed speaker notes Note: You will use this completed assignment in the Week Four Individual Assignment titled, "West Consulting Data Center Design." *********************************************** NTC 320 Week 4 Route Redistribution Planning For more classes visit www.snaptutorial.com NTC 320 Week 4 Individual: Route Redistribution Planning Assignment Preparation: Activities include completing the TestOut course, independent student reading, and research.

  15. Complete the following section of theTestOutNetworkPro course: Chapter 7, Routing (includes videos, charts, labs, and practice questions): • 7.3, Network Address Translation (NAT) Chapter 3, Networking Devices (includes videos, charts, labs, and practice questions): • 3.2, Network Devices Using Microsoft Visio, show some potential redistribution points in a typical enterprise network. Use Insert/Comment or Insert/Text Box to provide a brief explanation of each component. Submit your assignment using the Assignment Files tab. *********************************************** NTC 320 Week 4 Team Progress Report For more classes visit www.snaptutorial.com Learning Team: Week Four Progress Report Review the Learning Team assignment due in Week Five.

  16. Draft a physical diagram in Visio®. Include all networking components (routers, switches, firewall, etc), and indicate where and how the cable should be run. Include decisions about the type of cable (copper or fiber) in your narrative. Make sure to indicate the topology of the network and why this method was chosen. This diagram will be included in the final Week Five deliverables. Update your project plan with percent complete. Submit your assignment using the Assignment Files tab. NTC 320 Week 4 Team Reding Health Group WLAN and Data Center Design For more classes visit www.snaptutorial.com NTC 320 Week 4 Learning Team: Reding Health Group WLAN and Data Center Design Resource:  Reding Health Group Enterprise Network Project Overview As a team, build on your previous Reding Health Group assignments this week. Create a design in Microsoft® Visio® that integrates WLAN and datacenter/DMZ into the network design.

  17. Include annotations that identifies the various incorporated security considerations and components. Submit the Microsoft® Visio® file to the Assignment Files tab. *********************************************** NTC 320 Week 4 West Consulting Data Center Design For more classes visit www.snaptutorial.com Week 4 To continue the support of the growth expansion plan and proposal for West Consulting, this week you will develop the data center design and security plan. Design an enterprise data center solution that expands the campus LAN network, which has reached its capacity. The design must include the following:

  18. • A logically separated WLAN infrastructure that can be integrated into the existing enterprise network • Data flows between segments of the enterprise network - public (outside), DMZ, private, and data center Incorporate feedback you received from your instructor on the diagram from the Week Two Individual Assignment, "West Consulting Modular Design Proposal." Use this revised diagram, and the information from all previous assignments, as the basis for this diagram. Create a high-level network security policy that identifies key network security measures. Include the following components: • List of network assets and their use(s) • Potential threats and vulnerabilities in which assets need to be protected from including; open ports, malware, viruses, and specific types of attacks • Detailed security methods you will use to protect these assets and how they will be implemented • A high-level incident handling process for two of the network attacks you identified, including whom to contact (by role), what should happen to the asset, and how to protect data Diagram your data center design in Microsoft® Visio®. Document your security policy as either: • A 2- to 3- page Microsoft® Word document • A Microsoft® Excel® spreadsheet, properly formatted for easy reading and reference NTC 320 Week 5 Comprehensive Network Design

  19. For more classes visit www.snaptutorial.com NTC 320 - Week 5 Individual: Comprehensive Network Design Complete an 8- to 10-slide PowerPoint presentation that represents a comprehensive network design, based upon Weeks One through Four Individual TestOut Assignments. The presentation should represent an organization's network, including WAN, LAN, and Home User designs. You will combine your topology for the Home User, Company Data Center, Office WAN solution, IP Address schema, and protocols being used. Scenario: You are a Network Engineer. You have been tasked with a new project for Company X, to evaluate current network solutions and provide recommendations to the Chief Technology Officer (CTO) on how he should design the LAN and WAN and make use of wireless solutions. In addition, Company X has hundreds of virtual workers. You are to make recommendations for those users to ensure they have an efficient home network setup. Consider buildings, distance, and range of network solutions needed. Ensure the presentation includes: • Wired LAN Design • WAN Design • Protocols Implemented • Wireless LAN The presentation should include speaker notes that provide explanation for all design considerations, including topology choices for WAN and LAN, IP addressing, and protocols. In addition, a 2- to 3-page Executive Summary is required. The Executive Summary should include an explanation of your solution,

  20. justification behind architecture decisions, and a Reference page with a minimum of 4 sources in APA format. Submit your assignment using the Assignment Files tab. *********************************************** NTC 320 Week 5 Team Reding Health Group Enterprise Design Summary For more classes visit www.snaptutorial.com NTC 320 Week 5 Learning Team: Reding Health Group Enterprise Design Summary This week, you and your team will design the voice and video network and compile your full enterprise design for submission. Create a Microsoft® Visio® diagram illustrating the integration of the voice and video network components into the full enterprise network design. Note: Use your WLAN and Data Center Design from the Week 4 Learning Team Assignment with incorporated instructor feedback.

  21. Compile the results of the Learning Team Reding Health Group assignments from Weeks Two, Three, and Four and create a final enterprise network design proposal that includes the following:  The full enterprise network design, including: o A campus LAN design for the headquarter location that includes the physical and logical network design for each building o VLANs for each department o Datacenter design o A branch office network design for each location o An Enterprise WLAN design for each branch office o An Enterprise WAN design that demonstrates medium connectivity between each site o An Enterprise collaboration network for voice and video o Remote and seamless Internet connectivity  Proposal Recommendation: o An Executive Summary stating the purpose of the project and identifying key components of the proposed design o A short description of each network module Create your proposal narrative as either:  A 3-page Microsoft® Word document  A 10- to 12-slide Microsoft® PowerPoint® presentation with detailed speaker’s notes Compress the proposal and design diagram files into a ZIP folder. Submit the ZIP file to the Assignment Files tab. NTC 320 Week 5 West Consulting Voice And Video Network Design And Final Proposal

  22. For more classes visit www.snaptutorial.com Week 5 Resources: • West Consulting Network Design Summary • Week One Individual Assignment, "West Consulting Customer Design Summary" • Week Two Individual Assignment, "West Consulting Modular Design Proposal" • Week Three Individual Assignment, "West Consulting IP Addressing Schema" • Week Four Individual Assignment, "Data Center Design" To complete your final expansion plan and proposal for West Consulting, this week you will develop the voice and video network design and compile the efforts of your previous assignments to create a comprehensive proposal. Incorporate feedback you received from your instructor on the diagram from the Week Four Individual Assignment, "West Consulting Data Center Design." Use this revised diagram, and the information from all previous assignments, as the basis for remainder of this assignment. Design a voice and video network that meets West Consulting's needs, including annotations that highlight how traffic concerns will be addressed. Diagram your voice and video network design in Microsoft® Visio®. Create a final network growth and expansion proposal that includes the following: • An Executive Summary of the proposal • A summary of the project purpose, including:

  23. • West Consulting's business needs • West Consulting's current network status • West Consulting's desired or needed network status • Constraints or issues to be considered in your design • Completed network design proposal that includes the following: • Campus LAN • Enterprise WAN • IP Addressing Schema • Data Centers • WLAN Security • Voice and Video Integration • Summary of network security concerns and plans • A recommendation to virtualize two network components in your design, including the benefits of virtualizing the two components • A summary of requirements to ensure the implemented design is effective • A summary of risks and suggested controls to ensure the network is implemented effectively and optimized for future growth Create the narrative portions of the proposal as a 6- to 7-page Microsoft® Word document. *********************************************** NTC 320 Week 5 Wireless Design Project (word file only)

  24. For more classes visit www.snaptutorial.com Learning Team: Wireless Design Project In a 3- to 4-page paper, compose a detailed analysis of all design considerations. Treat this as a project report to your client. Include the design criteria, the assumptions, a descriptive security plan, and rationale for your decisions. As an addendum, include the following items created in previous weeks in your report: • A Visio diagram of your recommended floor configuration identifying coverage areas. Be sure to include your recommendations for where offices and cubicles would be best situated. Use your updated draft from Week Three. • A Visio diagram of recommended access point locations. Be sure to provide coverage for the outside work area. Use your updated draft from Week Four. • A project timeline. Include a graphical timeline with explanation that highlights each phase of the project. Use your updated project plan developed in Week Two as a template for how your team would implement this project. Submit your assignment using the Assignment Files tab. ***********************************************