60 likes | 70 Views
Buy treadmill online for Gym and Home from PowerMax Fitness India at best price. Shop best treadmill brand in India for commercial and domestic uses. Treadmill for home use at https://www.powermaxfitness.net/
E N D
PowerMax TDM-125 Semi-Auto Lubricating Treadmill with Android & iOS App Website : https://www.powermaxfitness.net/
About OF Treadmill • Lifetime Frame Warranty, 3-Year Motor Warranty, And 1-Year Parts And Labour Warranty • 2.0HP DC Green Efficient Motor • 3-Level Manual Incline for intense workout • 5.5” Bright Blue LCD display - Speed, Time, Distance, Calories and Heart rate • Max User Weight: 115KG • Speed: 0.8 - 16.0 km/hr with speed select hot keys • Smart Run Function • BMI fat function, 12 pre-set programs for efficient workout & 3 target based modes • Dual spring shock absorbtion with double layer running board • Mobile & tablet holder for safe keeping your smart devices while running • Hydraulic softdrop system (HSS) for easy folding & unfolding • Running surface (L x W) – 1260 X 420mm / 49.6 X 16.5 inch Buy Treadmills Online at Best Prices at PowerMax
Lifetime Frame Warranty, 3-Year Motor Warranty, And 1-Year Parts And Labour Warranty • 2.0HP DC Green Efficient Motor • 3-Level Manual Incline for intense workout Treadmill Online shop at Amazon for Home use
5.5” Bright Blue LCD display - Speed, Time, Distance, Calories and Heart rate • Max User Weight: 115KG • Speed: 0.8 - 16.0 km/hr with speed select hot keys • Smart Run Function • BMI fat function, 12 pre-set programs for efficient workout & 3 target based modes Buy Treadmill Online @ Flipkart
BMI fat function, 12 pre-set programs for efficient workout & 3 target based modes • Dual spring shock absorbtion with double layer running board • Mobile & tablet holder for safe keeping your smart devices while running Online Treadmill Price at G9fitness
Hydraulic softdrop system (HSS) for easy folding & unfolding • Running surface (L x W) – 1260 X 420mm / 49.6 X 16.5 inch • Multifunction: Massager, Twister, Dumbbells & Sit-up bar • Auto Lubrication And Wheels for Easy Transportation • Website : https://www.powermaxfitness.net/