the dripping water torture l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
The dripping water torture PowerPoint Presentation
Download Presentation
The dripping water torture

Loading in 2 Seconds...

play fullscreen
1 / 5

The dripping water torture - PowerPoint PPT Presentation


  • 248 Views
  • Uploaded on

The dripping water torture Plan Changes in Marlborough District Plan The Problem On site sewage disposal in Sounds Unsuitable soil types High loadings for short periods Old, unsuitable technology for effluent disposal Historically unchallenged rapid increase in demand for holiday homes

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'The dripping water torture' - Philip


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
the dripping water torture

The dripping water torture

Plan Changes in Marlborough District Plan

the problem
The Problem
  • On site sewage disposal in Sounds
    • Unsuitable soil types
    • High loadings for short periods
    • Old, unsuitable technology for effluent disposal
    • Historically unchallenged
    • rapid increase in demand for holiday homes
    • Aquaculture and recreational use growing
the solution
The Solution
  • Make Council accountable for the results
  • Prove the problem, convince that a change needed
  • Look at current rules
  • Ammend for sustainable management
  • Council enlist a “Gunn”
the solution4
The Solution
  • No. Operative Changes Status Description of the change
        • PC7 On-site discharges of Domestic Wastewater Notified 21/4/05
        • Submissions 20/5/05
        • Summary 9/6/05
        • Further Submissions 8/7/05
        • Hearing 19-20/9/05
        • Decisions Decisions 8/12/05
  • Operative10/03/06 The Plan change amends the existing provisions in the plan relating to on-site wastewater management systems ("on-site systems).
  • A range of additional objectives and policies, and several changes to the rules, were developed to protect the Marlborough Sounds environment
the solution5
The Solution
  • http://www.marlborough.govt.nz/content/docs/plans%20and%20reports/PlanChange7%2DOperative%2D10March06.pdf
  • MSRM Plan ammended to deal comprehensively with on site disposal in the most sensitive of areas.