1 / 1

Nu Flow Retrofit Is Long-Term Solution for Busy Shopping Center

Nu Flow, the world’s leading inside-infrastructure corporation, avoided destruction and occupant displacement at<br>the Grossmont Shopping Center in La Mesa, California, while rehabilitating a failing cast iron piping system with a<br>pipe retrofit.

Nuflowtech
Download Presentation

Nu Flow Retrofit Is Long-Term Solution for Busy Shopping Center

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Where life interacts with infrastructure. Nu Flow Retrofit Is Long-Term Solution for Busy Shopping Center Nu Flow, the world’s leading inside-infrastructure corporation, avoided destruction and occupant displacement at the Grossmont Shopping Center in La Mesa, California, while rehabilitating a failing cast iron piping system with a pipe retrofit. Project: Retrofit the lateral sewer line located inside a mall under a Starbucks and Barnes & Noble store, without disruption to tenants. Customer: CB Richard Ellis, a global leader in real estate services and property manager for the Grossmont Shopping Center. Site: Grossmont Shopping Center, La Mesa, California, a 939,000 square foot, single-level outdoor center. System: The lateral sewer line consists of 60 feet of 4” cast iron pipe installed in 1961. The line runs under the middle of the Barnes & Noble sales floor to the Starbucks. Situation: Corrosion of the cast iron sewer line resulted in chronic failure including clogging and multiple backups that required a plumber to clear. Camera inspections revealed that the bottom of the pipe had a large hole. “As opposed to using traditional methods of replacing the failed portion of pipe and inconveniencing our tenant, we chose to hire Nu Flow to line the interior of the pipe with an epoxy. We completed this work over two years ago and have not experienced an issue since.” Solution: First, Nu Flow cleared the corrosion inside the pipe, returning it to its original inside diameter. Once complete, the pipes were retrofitted with the patented Nu Flow process by pulling a seamless structural liner into place, extending the pipes useful life. Nu Flow performed the work after mall hours to avoid disruption to the mall’s operations with a procedure that did not require digging through the floors and foundation. - Mike Hansen, General Manager Aged and failing pipe systems are common in commercial, industrial and residential buildings. Whether you are experiencing problems now or are interested in preventing the inevitable failure of your plumbing system, Nu Flow is available to restore your peace of mind. North America: 1-800-834-9597 | International: 1-905-433-5510 info@nuflowtech.com | www.nuflowtech.com p/n 391 v1.2

More Related