An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Variants with be.as script

  2. This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any way acknowledged or endorsed by SAP. For SAP Business One, only the documentation and training officially released by SAP shall be binding upon SAP. SAP shall not be responsible for any content of this documentation and training and this documentation and training shall not be binding upon SAP in any way. The official current SAP Business One documentation and training for SAP Business One is available at http://service.sap.com/sbocustomer/documentation and http://service.sap.com/sbocustomer/training.

  3. Variants with be.as scriptAdvantages • Works with simple variantsas well aswiththeproductconfigurator • Based on scripts, very easy to use in complex calculations • Does not require maximum BOMs or a maximum-routing to filter from

  4. Variants with be.as scriptApplication range Is used when: • Complex variants are to be defined • Conditions must be handled • If maximum BOMs or a maximum-routings are inappropriate

  5. Variants with be.as scriptAdvantages to the formula based variant generator • Scripts are deposited in the work sequence, item or BOM • BOM positions and work sequences can be created from the script • Easy use when you have some knowledge of be.as script • Conditions can be represented easier • Better handling of complex tasks

  6. Variants with be.as script BOM Extension Job: into an emptyassemblyfor variant A material test003 andfor variant B material test004 istobeinsertedas material position. For this, click in the empty assembly on the yellow C in front the item number. (If a script has been deposited, the C turns to S )

  7. Variants with be.as script BOM Extension The script editor opens. On the right side all available functions and variables (variant domain) are displayed.First the variant should be queried: Double click on "Variant ID (A… Z.)". An IF statement is inserted. Next remove the 3 points and double-click on "add bom position". Now the Add command is inserted.

  8. Variants with be.as script Insert BOM Now remove all properties that are not needed and fill thenecessary properties with correct values. The IF statement is now copied for the variant B. Then a work sequence is added.

  9. Variants with be.as script Test Totestthe variant, changeto „calculation“ tabandstartthecalculationwith variant A. Youseethatthe material hasbeeninserted.

  10. Variants with be.as script Extension of work sequence In the same way can work sequences are inserted. You can insert positions, if the position number is already in use, it is replaced by a higher number.In this example, positions are defined in reverse order and then a work order is created.

  11. Variants with be.as script Alternative: enter field name As an alternative you can enter the field name.Important: At this the content must be stated according to the database content, eg. clockmandatory=1/0 corresponds bde=J/N. It is also possible to address all the fields which are not listed in the object.

  12. Variants with be.as script Change BOM Existing BOM can also be changed. The script is entered at the yellow C (S) before the position number of the BOM item. In the editor, access is available to all variant variables as well as to the properties of the BOM.Example: Variant A requires a set of 2 pieces.

  13. Variants with be.as script Routing and parallel resources Routing positions can be changed in the same way. Again, the script is entered at the yellow C (S) before the position number.All relevant properties can be accessed. Furthermore, a parallel resource can be entered. For this purpose "addparallelresource" is available.

  14. Variants with be.as script Notes • Scripts are taken into account in calculation and at the creation of work orders • They are not considered in the order proposal list (forecasts, customer orders) and batch pre-calculation. • As variants usually are used for make-to-order, consideration in order proposal list is usually not necessary. Alternatively, you can work with planned orders.

  15. Thank you for your cooperation!