An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Construccion de vivienda, obra gris 198,430.00 $ Partida 1 Obras preliminares 9,982.50 $ Subpartida Actividad 1.01 Limpieza 1.02 Descapote e=25.00 cm promedio 1.03 Trazo 1.04 Excavaciones 1.05 Desalojo Instalaciones hidraulicas AAPP y AANN Unidad m2 m2 m2 m3 m3 Cantidad Precio unitariosubtotal 3.00 $ 6.00 $ 3.00 $ 15.00 $ 12.00 $ 225 225 225 75 $ $ $ $ $ 675.00 1,350.00 675.00 1,125.00 1,995.00 166.25 1.06 m2 225 $ 18.50 $ 4,162.50 Partida 2 Cimentaciones de concreto 35,825.00 $ Subpartida Actividad 2.01 Zapatas Z-1 2.02 Zapatas Z-2 2.03 Solera fundacion CC-1 2.04 Solera fundacion SA-1 2.05 Solera humedad 2.05 Solera humedad 2.06 Piso concreto e=10cm Unidad C/U C/U metro metro metro metro m2 Cantidad Precio unitariosubtotal 650.00 $ 480.00 $ 75.00 $ 45.00 $ 65.00 $ 65.00 $ 45.00 $ 6 $ $ $ $ $ $ $ 3,900.00 4,800.00 6,750.00 1,800.00 8,450.00 8,450.00 10,125.00 10 90 40 130 130 225 Partida 3 estructura de soporte 27,485.00 $ Subpartida Actividad 3.01 Columnas C-1 3.02 Columnas C-2 3.03 Columnas C-3 3.03 Columnas C-4 3.03 Columnas C-5 3.03 Columnas C-6 3.03 Columnas C-7 3.04 Excavaciones 3.05 Desalojo Unidad unidad Unidad Unidad Unidad Unidad Unidad Unidad m3 m3 Cantidad Precio unitariosubtotal 450.00 $ 250.00 $ 250.00 $ 525.00 $ 780.00 $ 845.00 $ 690.00 $ 15.00 $ 12.00 $ 10 13 $ $ $ $ $ $ $ $ $ 4,500.00 3,250.00 2,000.00 8,400.00 4,680.00 845.00 690.00 1,125.00 1,995.00 8 16 6 1 1 75 166.25

  2. Partida 4 paredes de nivel 1 y piso de concreto nivel 1 33,705.00 $ Subpartida Actividad Construccion de pared de bloque 15x20x40, refuerzo #4 @ 60 cm 6.02 Repello de pared de bloque 6.03 Afinado de pared de bloque Elaboracion de cuadrados puertas y ventanas Unidad Cantidad Precio unitariosubtotal 6.01 m2 m2 m2 270 540 540 $ $ $ 85.00 8.00 6.00 $ $ $ 22,950.00 4,320.00 3,240.00 6.04 metro 75 $ 12.00 $ 900.00 6.05 inslataciones electricas en paredes m2 270 $ 8.50 $ 2,295.00 Partida 5 Vigas y entrepiso 33,120.00 $ Subpartida Actividad 5.01 Construccion de viga V-1 Suministro e instalacion de sistema de bovedilla y losa aligerada Construccion de vigas de coronamiento 5.03 coronamiento 5.04 Instalciones electricas entrepiso Unidad metro Cantidad Precio unitariosubtotal 125.00 $ 90 $ 11,250.00 5.02 m2 225 $ 75.00 $ 16,875.00 5.03 m2 m2 SG 90 90 $ $ $ 3.00 3.00 15.00 $ $ $ 270.00 270.00 3,375.00 225 5.05 Instalaciones hidraulicas entrepiso SG 225 $ 6.00 $ 1,350.00 Partida 6 paredes de nivel 2 23,737.50 $ Subpartida Actividad Construccion de pared de bloque 15x20x40, refuerzo #4 @ 60 cm 6.02 Repello de pared de bloque 6.03 Afinado de pared de bloque Elaboracion de cuadrados puertas y ventanas Unidad Cantidad Precio unitariosubtotal 6.01 m2 m2 m2 225 450 450 $ $ $ 65.00 8.00 6.00 $ $ $ 14,625.00 3,600.00 2,700.00 6.04 metro 75 $ 12.00 $ 900.00 6.05 inslataciones electricas en paredes m2 225 $ 8.50 $ 1,912.50

  3. Partida 7 Estrcutura y cubierta de techo 31,500.00 $ Subpartida Actividad Suministro e instalacion de vigas macomber, pintura 2 manos Suministro e instalacion de polin "C" 4" ch 14, pintura 2 manos Suministro e instalacion de cumierta de techo lamina zinc alumn tipo tejalite cal 26 5.05 Instalaciones electricas techo Unidad Cantidad Precio unitariosubtotal 1.01 m2 225 $ 65.00 $ 14,625.00 1.02 m2 225 $ 15.00 $ 3,375.00 1.03 m2 m2 225 225 $ $ 45.00 15.00 $ $ 10,125.00 3,375.00 Partida 8 desmovilizaciones 3,075.00 $ Subpartida Actividad 8.01 Limpieza final 8.02 Desalojo Unidad m2 m3 Cantidad Precio unitariosubtotal 3.00 $ 12.00 $ 225 200 $ $ 675.00 2,400.00