An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ODOT Industry Leadership Team2008 Accomplishments ODOT / AGC Industry Annual Meeting Friday, February 6, 2009 Salem Conference Center

  2. Implementation of DBE Goals • FHWA approved waiver September 2008 to allow race conscious goals. • Included in specification as of November 2008. • Include on projects with available subcontract work within a reasonable travel distance of where these DBE’s are available.

  3. Apprenticeship Specifications • Include 10% Goal in OTIA III Tri- County area contracts • Move to Incentive/Disincentive payment to encourage better compliance. • Currently specify number of hours rather than percent with expectation to provide in all crafts.

  4. Relief of Responsibility • New specification developed • Balances risk for damage caused by public traffic • ODOT to pay for damages to finished work at 75% of FA rate • New specification implemented by Spring 2009

  5. Bid Schedules • Added Bid Dates to spread out projects • First priority is Thursday when possible • Add Tuesday Bid Opening as necessary • Provide advance notice of Tuesday openings

  6. Specialty Insurance Requirements • Asbestos and Lead • Significantly reduced where this is specified • Review required by expert before included in project

  7. Escalation Specifications • Steel, Fuel and Asphalt • Design/Build Specifications

  8. Pile Hammer Requirement • Added language to design manual to have designers try to limit needed hammer to 80,000 ft.-lbs., if possible.

  9. Electronic Shop Drawings Submittal • Developed process to allow electronic submittals • Drafted an electronic shop drawing guide • Expected changes in specifications to allow by this summer • Allow by CCO as soon as Guide is finalized

  10. Contractor Payments