The new fdot construction bid option process
Download
1 / 12

The New FDOT Construction Bid Option Process - PowerPoint PPT Presentation


  • 118 Views
  • Uploaded on

The New FDOT Construction Bid Option Process. Dwayne Kile, P.E. District Seven Design Engineer. Bid Option Process – Why?. Growth Locally Internationally China India Material Shortages Liquid Asphalt Binder Aggregate Cement Steel Labor. Bid Option Process – Why?.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'The New FDOT Construction Bid Option Process' - Leo


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
The new fdot construction bid option process

The New FDOTConstruction Bid Option Process

Dwayne Kile, P.E.

District Seven Design Engineer


Bid option process why
Bid Option Process – Why?

  • Growth

    • Locally

    • Internationally

      • China

      • India

  • Material Shortages

    • Liquid Asphalt Binder

    • Aggregate

    • Cement

    • Steel

    • Labor


Bid option process why1
Bid Option Process – Why?

  • Contracting industry flush with work

    • No guaranteed material quotes

    • More risk with larger projects

  • Need to Maintain Work Program

    • 35 Projects FY 06/07

    • 35 Projects FY 06/07 Total $276.3M

    • 13 Projects rejected FY 05/06

    • 13 Projects Total $331.1M

    • Total WP for 06/07 $607.4M


Bid option process impact
Bid Option Process - Impact

  • Re-let Projects

    • Resources

      • In-house utility staff

      • Consultant staff

    • Scheduling

      • Advanced relocation

      • After letting relocations


Bid options process details
Bid Options Process - Details

  • General

    • Pro-active approach to minimize delays caused by re-letting of projects

    • Maintains work program stability

    • Limited use


Bid options process details1
Bid Options Process - Details

  • Specifics

    • Lists items for potential reduction

    • Automatic award with first option within 10% of option bid

    • Allows award for the minimum contract in lieu of re-letting project

    • Items listed in order of least importance

    • Plans show full option, modified after award


Bid option process d7 pilot projects
Bid Option Process – D7 Pilot Projects

  • SR 60 (Kennedy Boulevard) – E. Kennedy Draw Bridge to Channelside Drive and US 41 (Tampa Street) – Violet Street to Jackson Street

    • Eliminate Drainage Improvements

    • Alternative Pavement Design


Bid option process d7 pilot projects1
Bid Option Process – D7 Pilot Projects

  • US 41 (Nebraska Avenue) – Hillsborough Avenue to Kennedy Boulevard

    • Eliminate Segments of Drainage Improvements

    • Alternative Pavement Sections

  • SR 676 (Causeway) – US 41 to US 301

    • Reduced project length for primary project

    • Eliminate lighting


Bid option process d7 pilot projects2
Bid Option Process – D7 Pilot Projects

  • US 92 (SR 600) – Eureka Springs Road to SR 566

    • Eliminate Pedestrian Bridges

    • Eliminate Dedicated Right Turn Lane

    • Eliminate Dual Left Turn Lanes

    • Eliminate 10 Miles of Sidewalk




Bid option process
Bid Option Process