


1. TECHNICAL SOLUTION TO IMPROVING ELECTRICITY SERVICE FOR THE URBAN POOR AREA Widyastomo sarl,
Sao paulo, 3-6 December 2007
3. PT PLN (Persero) BUSINESS ACTIVITY GENERATIONthe installed capacity 21,564 MW
The generation capacity:Hydro Power Plants 3,184 MWOil-fired Diesel Power Plant 2.921 MWSteam Power Plant 6,900 MWGas Turbine Power Plant 1,481 MWCombined Cycle Gas Turbine Power Plants 6,561 MWGeothermal Power Plants 395 MW
TRANSMISSION AND DISTRIBUTIONFor Java-Bali, PLN has an Interconnected Transmission System of 500 kV and 150 kV, while for outside Java-Bali the system used is the separate transmission of 150 kV and 70 kV.
the length of the Transmission Line : 31.534 kms.The MV distribution line : 246.885 kms, and the LV Line : 333.634 kms.
6. Cross subsidies tarif &Public Service Obligation policy for the lowest income customerHousehold connection Tariff
8. Loss rate in the 3 last yearthe fact
9. Losses Mapping
11. Illegal connection
12. Illegal Publik lighting
13. CLASIFICATION OF VIOLIATION ACTION AT WHM MCB BOX A : there is no indicating violiation action, but some seal or part of WHM/MCB was broken
B : To influence MCB
C : To influence WHM
D : To influence MCB & WHM
E :There is something happen at WHM- MCB Box and it makes the WHM stand meter fail eventhough the seal is in its positions
16. Non technical loss reduction program Periodically inspection - Harsh penalty & Incentive policy
improvement meter reading quality
WHM replace
Pooling WHM Instalation (the next program)
Electronic WHM (the next program)
Conversion of customer from fixed rate to metered rate
Computerized data management
17. 1. METER READING Outsourcing companyimprovement meter reading quality
18. 2, CONCENTRATE WHM to reduce theft/WHM manipulation at WHM-MCB Box instalation
19. 3. ELEKTRONIC WHM With anti tampering indicating lamps
Rolled back wire
Short circuit CT terminal connection.
Disconected neutral cable
Variable Resistor instalation at neutral cable
Current injection at phase wire
Flux magnet influence
20. Conclusion The overall government policy in Indonesia regarding electric power is that in principle electricity should be available to all people in Indonesia; On the other hand, the electricity end-user is presented with the bill for his power consumption.Its realy make some dificullty condition for Distribution WBU management.
At Ciracas Jakarta-the Poor Urban area, PLN as the Electric State Cooperation, facing at the social obligation tasks with carefully. Periodically inspection, Harsh penalty & Incentive policy and Improvement meter reading quality customer house hold connection must be done day by day.
Review house hold connection & Meter kWH instalation standard; Its hope be implemented as the technical solution to reduce theft / kWH manipulation
I