kingdom of morocco ministry of land use management water and the environment
Download
Skip this Video
Download Presentation
Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment

Loading in 2 Seconds...

play fullscreen
1 / 21

Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment - PowerPoint PPT Presentation


  • 290 Views
  • Uploaded on

Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment. Moroccan CDM projects 2 full size and 2 small scale CDM projects. The First Carbon Exhibition in North Africa and Middle East Region Djerba, 22-24 September 2004. M’hammed EL MERINI SCET Maroc [email protected]

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment' - Jimmy


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
kingdom of morocco ministry of land use management water and the environment

Kingdom of MoroccoMinistry of Land-Use Management, Water and the Environment

Moroccan CDM projects

2 full size and 2 small scale CDM projects

The First Carbon Exhibition

in North Africa and Middle East Region

Djerba, 22-24 September 2004

M’hammed EL MERINI

SCET Maroc

[email protected]

CD4CDM Project

moroccan cdm projects
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Moroccan CDM Projects
  • CDM full size projects:
    • Essaouira wind park;
    • Methane recovery from Akreuch landfill.
  • CDM small scale projects:
    • 10 MW wind park for Tan Tan desalination plant;
    • Methane recovery and electricity production in WWTP.
slide3
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Full size projects

essaouira wind park
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Essaouira wind park

Project summary

  • Full name :Power generation at Essaouira 60 MW wind farm;
  • Location : At Cap Sim, 15 km far from Essaouira;
  • Category : Renewable energy – Grid connected power generation;
  • Project promoter :Office National d’Electricité (ONE), public office;
  • PDD : EcoSecurities – CleanTech;
  • Date of operation : 2006;
  • First year of CER delivery : 2006;
  • Crediting period : 2006-2015;
  • Expected CER : 1.5 million.
essaouira wind park5
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Essaouira wind park

Project description

  • Technical issues :
    • Installed capacity : 60 MW using the wind power technology;
    • Expected production : 210 GWh per year;
    • Components : 71 horizontal axis wind turbines of 850 kW each, electronic devices for regulation and protection, LV/MV and MV/HV transformers, to supply the national grid at 60 kV.
  • Financial issues :
    • Total cost of the project : US $ 82.5 million
  • Timing :
    • Starting of works : end of 2004 ;
    • Operation : 2006.
essaouira wind park6
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Essaouira wind park

Baseline methodology

  • Methodology :
    • Used in “Wigton wind farm in Jamaica” and submitted to CDM EB.
  • Approach :
    • Demonstrate that the project is not BAU;
    • Determine the most likely scenario in absence of the project;
    • Determine the avoided emissions by calculating the Projected Operating Margin P CEF of the national power plants ;
  • Calculations :
    • Through the crediting period, the CEF moves down from 0.805 (2006) to 0.729 (2009) and then increases to 0.777 (2015);
    • Over the crediting period, the expected CER are about 1.5 million.
essaouira wind park7
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Essaouira wind park

Sustainable development

  • Environmental issues :
    • Wind power as a non polluting energy source compared to fossil fuels (air pollution, soil and water resources contamination…);
    • Wind power as a renewable energy, not endangering energy supply for future generations.
  • Social issues :
    • Creating employment opportunities in the region (workers, transportation, trade, catering…);
    • Enhance economic activity in rural area (hotels, local shops…).
methane from akreuch landfill
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Methane from Akreuch landfill

Project summary

  • Full name :Methane recovery from Akreuch landfill;
  • Location : At Akreuch, 12 km far from Rabat;
  • Category : Waste management – CH4 recovery from landfill;
  • Project promoter :City Council of Rabat;
  • PDD : EcoSecurities – CleanTech;
  • Date of operation : 2006;
  • First year of CER delivery : 2006;
  • Crediting period : 2006-2026;
  • Expected CER : 1.6 million.
methane from akreuch landfill9
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Methane from Akreuch landfill

Project description

  • Technical issues :
    • A 4.3 hectare landfill with 25 to 45 m deep layer of waste.
    • Draining network as central wells with gas from 20 to 30 m around;
    • Collecting network at 25 m depth taking gas from wells to the drying, suction, flaring system.
  • Financial issues :
    • Total cost of the project : US $ 1 million
  • Timing :
    • Starting of works : end of 2005 ;
    • Operation : 2006.
methane from akreuch landfill10
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Methane from Akreuch landfill

Baseline methodology

  • Methodology :
    • AM0003 methodology, approved by the CDM EB (11th meeting).
  • Approach :
    • Simplified financial analysis of the investment project when BAU is the one possible option;
    • Two options : Project and BAU.
    • Determine the amount of waste at the closing of the landfill (2004), calculate the emissions for both the options and deduce the CER. The formula used is the US EPA model : LFG = 2 Lo R (e-kc – e-kt).
  • Calculations :
    • At the closing of the landfill, the amount of waste will be 3.1 million tons.
    • Over the crediting period, the expected CER are about 1.6 million.
methane from akreuch landfill11
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Methane from Akreuch landfill

Sustainable development

  • Environmental issues :
    • Reduction of greenhouse gas emissions;
    • Reduction of explosion and fire risk as in uncontrolled landfill (BAU);
    • Control of the waste leachate which can contaminate the soil and ground water;
  • Social issues :
    • Reduction of health risks on the local population
    • Improvement of live conditions in the region and creation of better work opportunities (cafe, grocery, trade…).
slide12
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004

Small scale projects

tan tan wind park
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Tan Tan wind park

Project summary

  • Full name :10 MW wind park for the Tan Tan SWDP;
  • Location : At Sidi El Gran, 12 km to the north of Tan Tan city;
  • Category : 1-D : Renewable energy production for the grid;
  • Project promoter :ONEP – public agency;
  • PDD : SCET Maroc - GERERE;
  • Date of operation : 2007;
  • First year of CER delivery : 2007;
  • Crediting period : 2007-2016;
  • Expected CER : 194,500.
tan tan wind park14
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Tan Tan wind park

Project description

  • Technical issues :
    • Installed capacity : 10 MW using the wind power technology;
    • Expected production : 22.5 GWh per year;
    • Components : 25 horizontal axis wind turbines of 500 kW each, electronic devices for regulation and protection, LV/MV transformers, to supply the national grid at 22 kV.
  • Financial issues :
    • Total cost of the project : US $ 36 million (including the SWDP).
  • Timing :
    • Starting of works : 2005 ;
    • Operation : 2007.
tan tan wind park15
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Tan Tan wind park

Baseline methodology

  • Methodology :
    • Described in paragraph 29 of Appendix B of the simplified M&P.
  • Approach :
    • Demonstrate that the project is not BAU;
    • Determine the most likely scenario in absence of the project;
    • Determine the avoided emissions by calculating the Combined Operating Margin with recent additions P CEF of the national power plants ;
  • Calculations :
    • Through the crediting period, the CEF moves down from 0.896 (OM) to 0.836 (RA);
    • Over the crediting period, the expected CER are about 194,500.
tan tan wind park16
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Tan Tan wind park

Sustainable development

  • Environmental issues :
    • Wind power as a non polluting energy source compared to fossil fuels (air pollution, soil and water resources contamination…);
    • Wind power as a renewable energy, not endangering energy supply for future generations.
  • Social issues :
    • Creating employment opportunities in the region (workers, transportation, trade…);
    • Enhance economic activity in rural area (hotels, local shops, tourism activities…).
methane from wwtp
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Methane from WWTP

Project summary

  • Full name :Methane recovery and electricity generation from a WWTP;
  • Location : At Marrakech city;
  • Category : 3-D (Methane recovery) and 1-D (Renewable energy production for the grid);
  • Project promoter :RADEEMA – public agency;
  • PDD : SCET Maroc - GERERE;
  • Date of operation : 2007;
  • First year of CER delivery : 2007;
  • Crediting period : 2007-2016;
  • Expected CER : 112,500.
methane from wwtp18
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Methane from WWTP

Project description

  • Technical issues :
    • WWTP for 1 m3/s (pretreatment, primary, settling, sludge treatment);
    • Biogas collecting from digester 11,000 up to 20,000 m3/day;
    • Expected electricity generation : 8 up to 14.5 GWh per year;
  • Financial issues :
    • Total cost of the project : US $ 19.3 million
  • Timing :
    • Starting of works : 2005 ;
    • Operation : 2007.
methane from wwtp19
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Methane from WWTP

Baseline methodology

  • Methodology :
    • Paragraph 86 for activity 3-D and paragraph 29 for activity 1-D, of Appendix B of the simplified M&P.
  • Approach :
    • For activity 3-D, calculate the emissions for both the project and BAU options and deduce the CER;
    • For activity 1-D, determine the avoided emissions by calculating the Combined Operating Margin with recent additions P CEF of the national power plants ;
  • Calculations :
    • The CEF moves down from 0.896 (OM) to 0.836 (RA);
    • Over the crediting period, the expected CER are about 112,500.
methane from wwtp20
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004Methane from WWTP

Sustainable development

  • Environmental issues :
    • Biogas power as a non polluting energy source compared to fossil fuels (air pollution, soil and water resources contamination…);
    • Biogas power as a renewable energy, not endangering energy supply for future generations.
    • Enhancing the quality of natural areas and resources by treating the waste water before disposal;
  • Social issues :
    • Better life framework (better quality of natural areas and resources, no more odor, healthy life conditions…);
slide21
For more informations :Permanent Secretariat of CDM National CouncilClimate Change Unit Directorate of Partnership, Communication and Cooperation Ministry of Land-Use Management, Water and the Environment36 Avenue Al Abtal –Rabat –Morocco Tel/Fax : +212 37 68 17 59 Tel/Fax: +212 37 77 47 [email protected]@mtds.comwww.mdpmaroc.com
ad