Mobile Landing Platform (MLP). Platform. Description. Speed 20 kts Transit Waterline (Loaded) 25.2 ft Crew 55 (MSC), 11 (LCAC Det) Embarked Landing Force 856 (128 Navy; 728 USMC) Medical Capability 1,281 ft2; 4 Ward Beds

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Platform' - JasminFlorian


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Mobile Landing Platform (MLP)

Platform

Description

Speed 20 kts

Transit Waterline (Loaded) 25.2 ft

Crew 55 (MSC), 11 (LCAC Det)

Embarked Landing Force 856 (128 Navy; 728 USMC)

Medical Capability 1,281 ft2; 4 Ward Beds

Potable Water 200,242 gal

Surface Interface Point 2

Well Deck Capacity 6-LCAC

Flight Deck (Level/Class) 1 Land/Launch Spot (I/2); VERTREP lift Spot (I/4)

UAS Adjacent Space 1000 ft2

Ramp 1 Self-depl LMSR/MLP Veh; 1 Portable Veh access

Vehicle Square (Ro/Ro) 51,560 ft2 (Stowage for50 ISO 1CC Containers)

Lifting Capability (lbs) 1 52.9K single boom container crane,130’ lift radius

2 22K extended boom stores crane (port/stbd)

2 11K bridge cranes (LCAC lanes) (port/stbd)

Cargo Fuel (JP-5) 1 mil gal

Motor Gasoline (MOGAS) 550 gal (jettisonable drums)

3 MLP New Design and Build

MPF(F) MLP VS(1) Requirements Validation Study February 6, 2008 Placemat

Program Status

Issues

  • CDD Increment 1
  • JCB 13 Feb 2008 Approved
  • JROC Approval March 2008
  • DAB Jun 2008 (Pending ADM signature)
  • Acquisition strategy approved – Supports RFP Jul 2008
  • Systems Design Award 15 Sep 2008
  • Milestone B FY10
  • Procurements
    • 1 (FY10) Delivery (FY15)
    • 2 (FY12); Delivery (FY16)
    • 3 (FY13); Delivery (FY17)
  • Ship 2 & 3 funding addressed during POM-10
  • Program of Record is for 3 ships
  • Key Sea Basing Enabler
  • Use of Float On Float Off (FLO/FLO) Commercial technology
  • TEU handling Capability added
  • Will Require additional C4I upgrades to support MEB CE and Air Space Management task if “Big Decks” are omitted
  • Vehicle Transfer System (VTS) is new technology

6-4