Legislation. Electricity Act 1992 plus amendments. Electricity Regulations 2003. AS/NZS 3000 wiring rules AS/NZS 3760: 2003 Inservice Safety Insp. & test. AS/ NZS 3012:2003 Con. & Demo sites. Electricity Regulations. Reg. 76(B) – AS/NZS 3760:2003

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Legislation' - JasminFlorian


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
legislation
Legislation

Electricity Act 1992 plus amendments

Electricity Regulations 2003

  • AS/NZS 3000 wiring rules
  • AS/NZS 3760: 2003 Inservice Safety Insp. & test.
  • AS/ NZS 3012:2003 Con. & Demo sites.
electricity regulations
ElectricityRegulations

Reg. 76(B) – AS/NZS 3760:2003

Inservice Safety Inspection & testing Electrical Equipment

Reg. 69(B)(d) – AS/NZS 3012:2003

Electrical installations – Construction & demolition sites.

standard
Standard

AS/NZS 3012:2003

Applies to all construction & demolition sites.

key points as nzs 3012 2003
Key points - AS/NZS 3012:2003
  • Support of cables entering switchboards –’flexible’.
  • All final sub-circuits protected by 30mA RCD’s.
  • Construction wiring must be separate to perm wiring.
  • Minimum flexible cord size 1.00mm2
  • Leads – Protect from mechanical damage.
  • – Supported off the floor.
lighting
Lighting

Festoon lamps

  • Lampholder permanently moulded to cable.
  • Non-conductive, mechanical guard.
  • Supported at least 2.5m from the floor.
lighting portable
Lighting - portable

Portable lamps

Must have a rating of IP2X or higher.

inspections
Inspections
  • Prior to initial service
  • Where new, supplier to test & tag.
  • Before return to service after servicing or repair.
  • Can use an individual tag or register.
  • Competent person can carry out testing & tagging.
  • Only a registered person with a current practicing license can carry out electrical repairs.

Testing & Tagging

testing tagging
Testing & Tagging

Table 2

  • 3 Monthly – Portable equipment.
  • RCD’s – trip test daily before use. (portable gear)

– monthly (fixed).

  • RCD’s testing every:

– 3 months portable.

– 12 months fixed.

testing tagging9
Testing & Tagging

Sheds & switchboards.

Require Certificate of compliance on completion of installation.

testing tagging continued
Testing & Tagging - continued
  • Testing & tagging – visual inspections.
  • All electrical devices made to AS/NZS 3105 do not comply with AS/NZS 3012:2003.
testing tagging continued11
Testing & Tagging - continued

Compliance

Plug boxes

  • Jackson(comply)
  • PDL(comply)
  • Others do not currently comply with AS/NZS 2012. (domestic plug boxes)