slide1 l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Post Processing Session 4 november 2009 Anders Ekström, Alexander Kennard PowerPoint Presentation
Download Presentation
Post Processing Session 4 november 2009 Anders Ekström, Alexander Kennard

Loading in 2 Seconds...

play fullscreen
1 / 16

Post Processing Session 4 november 2009 Anders Ekström, Alexander Kennard - PowerPoint PPT Presentation


  • 488 Views
  • Uploaded on

Post Processing Session 4 november 2009 Anders Ekström, Alexander Kennard Who uses the Post Processor? What are you doing with it? What values are you achiving by using the post-processor? StreamServe 4.1.1 introduced post processing concept in 2004 Initial use were for high volume print

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Post Processing Session 4 november 2009 Anders Ekström, Alexander Kennard' - Gabriel


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1
Post Processing Session

4 november 2009

Anders Ekström,

Alexander Kennard

slide2
Who uses the Post Processor?
  • What are you doing with it?
  • What values are you achiving by using the post-processor?
slide3
StreamServe 4.1.1 introduced post processing concept in 2004
  • Initial use were for high volume print
  • StreamServe Post Processor history

Before post processing

Post processing

slide4

Vad kan namnet komma ifrån?

  • Post - Postväsen, organiserade försändelser av brev och paket.
  • Post-, latinskt prefix som betyder "efter".
  • The concept of post processing

Post Process

Process

Sorting, Enveloping and driver

Layout and document composition

  • Layout requirements
  • Business
  • Marketing
  • Postal-operator savings
  • Printer environment
  • IT-infrastructure
slide5
Usual project configuration ”Best Practice”

Online output connectors in layout projects

Fax, email, local print, other

Layout project 1

Online channels

Online channels

Online channels

Layout project 1

Post processing

Layout project 1

Post processrepository

High volumeArchive

Business system

Common post processing project

StreamServe layout projects

High volume print & archiving

slide6

Basic StreamServe flow

  • The concept in more detail

Job

Message

OutQ

Event

Process

InQ

Outconnector

SDR-connector

Inconnector

Postprocessorrepository

(device independent)

OutQ

Inconnector

Outconnector

PPQ

StreamServe Postprocessor flow

why do you want to post process
Why do you want to post process?
  • Cost reductions
    • Postage savings
    • Co-enveloping, less stationery
    • E-inserts
    • Discounts on printing
    • Performance
  • Environmental savings
  • Post production functionalities and statistics gathering
  • Customer experience
  • “Driver ready packs”
  • Improve manual handling
  • Minimize manual handling
slide9
Postprocessor Repository / Job / Runtime
  • Document Broker
  • PPQ (Post-Processor Query)
  • Statistics
  • Mailmachine (%{TARGET})
  • Stored variable / Meta data
  • Sheet Layout
  • StreamServe Post Processor Terms and Functions
slide10
Resource repository
  • Document trigger
  • Scripting
  • StreamServe Post Processor Terms and Functions

$doc_id = GetFirstSegDoc();

while (num($doc_id) > 0)

{

$DocType = GetSegMetadata($doc_id, "DocType");

switch ($DocType)

{

case "A": $DocTypeA++;

break;

case "B": $DocTypeB++;

break;

case "C": $DocTypeC++;

break;

default: $DocTypeRest++;

}

$doc_id = GetNextSegDoc($doc_id);

}

slide11
Sending one or more ProductionOrders to StreamServe for further processing. Each ProductionOrder can

have 0-many Operational drawings in pdf format that needs to be printed together with the ProductionOrder.

  • Post Processor scenarios 1
slide12
One or more ERP systems send xml-invoices for processing in streamserve. The xml-files are divided into

smaller files for simpler handling and higher performance. Sending of AFP files to the printshop is done 3/week

  • Post Processor scenarios 2
slide13
In this case there are two document types (AccountStatement / Daily) that we would like to send in the same

envelope to the customer.

  • Post Processor scenarios 3
slide14
In this scenario the customer create PPQ for preview purpose before each batch is sent to the printshop. If ok a new PPQ

file is generated and all documents in Postprocessor Repository is selected.

  • Post Processor scenarios 4
slide15
Short Demo all components that are included in a PostProcessor project. The sample project have the same

architecture as scenario 4.

  • DEMO