keller isd cheer drill team tryout informational meeting l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Keller ISD Cheer/Drill Team Tryout Informational Meeting PowerPoint Presentation
Download Presentation
Keller ISD Cheer/Drill Team Tryout Informational Meeting

Loading in 2 Seconds...

play fullscreen
1 / 12

Keller ISD Cheer/Drill Team Tryout Informational Meeting - PowerPoint PPT Presentation


  • 303 Views
  • Uploaded on

Keller ISD Cheer/Drill Team Tryout Informational Meeting. Exciting Changes to the Tryout Process. Approved by Bob DeJonge November 21, 2008. Cheer Tryout Process. Tryouts will take place over a 4 day period Tryouts will be held: Monday, March 9 th – Thursday March 12 th .

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Keller ISD Cheer/Drill Team Tryout Informational Meeting' - DoraAna


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
keller isd cheer drill team tryout informational meeting

Keller ISDCheer/Drill Team Tryout Informational Meeting

Exciting Changes

to the

Tryout Process

Approved by Bob DeJonge November 21, 2008

cheer tryout process
Cheer Tryout Process
  • Tryouts will take place over a 4 day period
    • Tryouts will be held:
    • Monday, March 9th – Thursday March 12th.
  • Tryouts will consist of evaluations by the High School Coaches. The evaluation will consist of:
    • Jumps
    • Cheer
    • Dance
    • Tumbling
    • Stunts
cheer tryout process cont
Cheer Tryout Process Cont…
  • Evaluations will be processed and the results of the selected squads will be posted via internet and at the school on Friday March 13th at the end of the school day.
benefits of the new process
Benefits of the New Process

OUR MAIN GOAL IN THIS NEW PROCESS IS TO DO WHAT IS BEST FOR THE CANDIDATE AND THE PROGRAM.

Other goals for the new process include:

  • Eliminating the stress of tryout day.
  • Allowing the Coach/Director to see success over a period of time instead of a ‘snapshot’ on a tryout day.
  • Cheer – Selecting squads by ability including stunts.
  • Drill Team – Allowing candidates to tryout with different dance styles.
requirements for cheer tryouts
Requirements for Cheer Tryouts
  • Keller High School
    • Varsity Standing Back Tuck and Round Off Back or Round off Back Handspring Back
    • JV Standing Back Handspring

Round Off Back Handspring

    • Freshmen Standing Back Handspring

Round off Back Handspring

  • Central High School
    • Varsity Standing Back and Running Back
    • JV Standing Back Hand Spring

Round Off Back Handspring

    • Freshmen Standing or running Back Handspring
requirements for cheer tryouts con t
Requirements for Cheer Tryouts Con’t
  • Fossil Ridge
    • Varsity Standing Back and Running Back
    • JV Standing Back Hand Spring

Round Off Back Handspring

    • Freshmen No Minimal Requirement
cheer mandatory tryout meetings
Cheer Mandatory Tryout Meetings

ALL MEETINGS WILL BEGIN AT 6:30 PM!

You may attend any of the three meetings regardless of your feeder pattern.

A Parent/Guardian and the candidate

MUST attend one of these meetings to be eligible for tryouts.

Mon., January 26th Keller High School

Tues., January 27th Central High School

Wed., January 28th Fossil Ridge High School

drill team process
Drill Team Process
  • Each candidate will learn 3 short dance combinations.
  • Candidates will be evaluated daily and perform with current members on the last day.
  • Results will be posted via internet or posting after tryouts on the last day.
drill team tryout information
Drill Team Tryout Information
  • Keller High School
    • Mandatory Tryout Meeting:

March 24th 7:00 pm

    • Prep-Clinic (optional)

March 25th-27th; 4:15-6:15pm:

$5/day Dance Gym at KHS

    • Tryouts

March 30th-April 3rd

      • 4:00-6:30pm in the Dance Gym at KHS
      • Friday 4pm-? In the Dance Gym at KHS
drill team tryout information10
Drill Team Tryout Information
  • Fossil Ridge High School
    • Mandatory Tryout Meeting:
      • March 24th 7:00 pm
    • Try-out week March 30 – April 3rd  

4:00 – 6:30 PM at FRHS

drill team tryout information11
Drill Team Tryout Information
  • Central High School
    • Mandatory Tryout Meeting:
      • March 31, 7:00 pm
    • Prep-clinic (optional)

Jan. 26-28 & April 6-8

      • 4:00 pm – 6:00 pm
      • $5/day in the dance room
    • Tryout week April 14th -18th
      • 4:00pm – 6:30pm at CHS
timber creek high school
Timber Creek High School
  • One or more of the current High School coaches/directors will be coordinating the tryout process
  • March 31st Parent Information Meeting in the CHS cafeteria at 7:00 pm
  • April 6-9th Tryout Clinic in the CHS Dance Room 4:00-6:00 pm